FY2014 Work Plan Guidance General Information
FY2014 Work Plan Guidance Table of Contents
I. NAWQA SURFACE WATER AND GROUNDWATER ASSESSMENT
A. Groundwater
1. FY2014 GW Sampling & Data Collection Guidance
2. FY2014 GW Assessment Design
3. FY2013 GW Work to be Completed in FY14
4. FY2014 GW Work Planned
5. FY2014 GW Modeling & Mapping Work Plan
B. GWPLAN
1. FY2014 Planned Sample Counts-- Cycle 3 GWPlan
2. FY2013 Actual Sample Count Form to be completed (for full-networks)-- Cycle 3 GWPlan
C. Surface Water National Fixed Site Network (NFSN)
1. FY2014 NFSN Work Plan Guidance
2. FY2014 NFSN Budget Guidance
3. FY2014 NFSN Design
D. SWPLAN
1. NFSN Chem Sampling
2. NFSN Annual Eco Sampling
3. Sample counts, Sample frequency, and Definitions
E. Regional Stream Water-Quality Study (Regional Synoptic Study--2014 Southeastern Region)
1. XXXXX
2. XXXXXX
3. XXXXXX
F. Integrated Watershed Study
1. XXXXX
2. XXXXXX
3. XXXXXX
Work Plan Distribution
Lotus Alias: GS-W NAWQA Annual.WP.Distribution
Completed Science Center (SC) Work Plan Package should contain files requested in the Work Plan Guidance matrix. SC's having a "WP" in their respective columns, need to provide responses to the specific requests. In submitting work plan files, please use the following naming conventions when submitting files:
Please submit files to the NAWQA WPG Share Point url: https://collaboration.usgs.gov/wg/nawqa/HQwpg/SitePages/Home.aspx