-- February 11-13, 2003
Caribbean District Office -- Guaynabo, Puerto Rico



Meeting Attendees


Agenda and Meeting Notes

Monday, February 10, 2003     --     ITAC travels to Caribbean District Office

Tuesday, February 11, 2003

Time

Agenda Item, Presenter(s), & Expected Outcome

8:00 am

Welcome and Introductions / Agenda Review

Presented by:   Brian McCallum
Expected Outcome:   Information Updates

8:30 am

Caribbean District Program Overview { Attach presentation here }
Presented by:   Matt Larson, District Chief
Overview follows:   Matt has been at Caribbean District since 1987.

  • The island is frequently exposed to hurricanes and other large hydrologic events.
  • Caribbean tectonics plate's graphic shows PR is in the middle of two tectonic plates that move in opposite directions. PR susceptible to frequent small quakes. 1918 -- last large magnitude quake.
  • Bedrock geology -- Northern part of island is mostly limestone. In this area we find the islands major aquifer.
  • Island affected by various moisture events -- Trade winds, Northeastern cold fronts, inner tropical convergence zone among others.
  • Hurricanes can bring half of the islands needed rainfall but PR does not have the needed storage capacity.
  • Flooding used to be the major cause of death about 200 years ago. Thanks to advances in flood-warning systems, flood related deaths are now a rare incident.
  • During EL Nino PR get less hurricanes. During La Nina PR gets more hurricanes. We are entering a La Nina period. Many hurricanes expected this year. (NWIS chief later recommended that PR should be one of the first sites to move to NWISRT).
  • The island suffered major droughts at the end of the 90's.
  • Bermuda highs -- high-pressure zones also affect weather in PR. It prevents cold fronts from reaching us and moves tropical weather away. This yields to beautiful low humidity days but are drought prone events.
  • Removal of forest cover --increases storm flow and affects water quality; this is a concern to local government because PR has high urbanization.
  • Fecal colonies (a major problem in Northeastern and Southeastern part of the island) are polluting rivers.
  • Matt:   "We are taxing our resources pretty heavily in this island"; both electricity and fresh water. This problem is compounded by delays in repair of water leaks and illegal hook ups.
  • None of PR lakes are natural.
  • Real-time pages show substantially low streamflow in recent periods.

Expected Outcome:   Educate ITAC and guests on scientific elements involved in WRD projects.

9:00 am

Caribbean IT Overview { Attach presentation here }
Presented by:   John Parks, System Administrator

Overview follows:

  • Approximately 40 people, one NWIS server, one Lotus server, three NT.
  • 13 dial-up lines -- used for redundancy during hurricanes to get data to cooperators and to fax cooperators RTD graphics during emergency events.
  • Backup generators -- most important part of operations. One for computers, the other for office lighting. Following the last hurricane the office was on generators for 3 months. Generators switch on automatically but each can individually support the office with a manual override, in case one fails or needs servicing. Service plan test them one a week and services them once a month.
  • Strongly recommends Dreamweaver over Frontpage to validate web pages.
  • He is convinced that Frontpage is not good. Clean up scripts finds hundreds of unneeded page tags. Dreamweaver creates cleaner pages. He believes SAs are encouraged to use Frontpage because it is free.
  • The office has two web servers, one for development, the other a production server -- very easy to manage with Dreamweaver. He uses development site to preview pages. After DC approval they are pushed out to production server. He helped the SC District and PRs Department of Health redesign their web pages on the development server. Access to development server is limited to PR subnet.
  • Caribbean National Forest (El Yunque) Information Kiosk -- Bob Hirsh visited El Yunque and decided the USGS needed a presence at the visitor's center. He now has one kiosk up and running at the Caribbean District office and one at El Yunque available to the public.
  • The kiosk uses a free Internet map server called "MapServer" (very similar to ArcServer) to pull GIS layers that show the location of stream gages and rain gages. People can zoom into areas of interest. It is not currently tied to NWIS but he plans to rebuild the application to interact with NWIS. Everything available at the Kiosk is "local" data except one part ... the only time the kiosk goes out (to the internet) is to request hydrographs from NWISWeb. It makes an http query to NWISWeb. He strips everything from NWISWeb replies and displays only the graph.
  • Keyboard and mouse are hidden inside the kiosk. Tried using two different touch screens but one was too sensitive to humidity so he stuck with the pressure sensitive model.
  • Because of learning curve involved, the time it took to develop (3 years) and the change in technologies, the first kiosk cost about 50K but now could be done for almost half the cost.
  • The kiosk also has information about other USGS disciplines.
  • This was a joint effort from Hirsh, the Forest service and special initiative funds the District had. He is also working on other admin applications such as sign in and out, and a WRD guest information kiosk for the front office.
  • SA is also very involved in Hurricane Mitch project in Central and South America -- considered various technologies for data transfers DCP stations and NWIS databases but EMWIN proved most reliable and cost effective.
    • DRGS -- expensive- 35K-125K
    • Radio -- Radio repeaters come down during landslides, not reliable
    • Internet lines -- depends on communication lines which are not reliable in C&S America. 6K per month.
    • EMWIN -- Preferred method. Cheap, simple installation, reliable although sometimes data is transmitted twice. One time fee of 1.2K per ground station.
    • EMWIN -- has 3 cues.that prioritize jobs. Graphics are last. They cannot carry the 15K DCP sites that we (the USGS) have. Works well for Central and South America because they only have about 240 stations.

  • AD Research February 3-7, 2003 -- Sam Martinez, Scott Brondel, John Parks
    • Expected outcome -- to understand pro's and con's of the two AD models. John also needed to develop a plan to migrate one loaded NT server (that handles RAS, WEB, BDC and dial-up pools) to separate servers.
    • They tested using RAS dial-out to communicate with the central AD servers in case of an emergency. John said it worked well. This is a possible solution to WAN outages but only for offices that have separate lines for WAN and phone traffic (separate T1s).
    • PR currently has 3 NT servers. They now plan to buy 4 low-end to mid range systems, continue using 2 existing systems and decommission one.
    • Kerberos tickets are good for 8- to 10-hours (adjustable parameter). If users stay logged in, they should be ok even if both WAN and RAS dial-out are down.
    • Test started at 1:30pm and communications were established within an hour using RAS.
    • Paul suggested testing when users are just arriving to the office and logging in the morning.
    • John sees the same issues with a central implementation as we have seen with Lotus before he got a local Lotus server.

    Expected Outcome:   Educate ITAC and guests on Information Technology:
    • accomplishments and strengths of Caribbean District.
    • share Information Technology with other WRD offices.

9:45 am

BREAK

10:00 am

TOWN HALL MEETING -- brief presentations: Presented by:   ITAC Members & District Employees

  • Local District issues:
    • IDs now required due to orange code.
    • Largest number troops activated in PRs history. District Chief mentioned staff family members that have been activated.
    • IT purchase freeze still on.
    • Congratulations for 3 Awards and 4 promotions.

  • ITAC Overview (5 minutes) -- Brian McCallum
  • Recent achievements -- Raised concerns on BASIS plus, alerted WRD Senior staff of issues the offices are facing; influence Bureau on AD direction; jump started SLEDS implementation; Guidelines for Home Computing; list of training needs for SA training; but most importantly, improved communications and raised field concerns to the GIOs office.

  • Bureau IT issues (10 minutes) -- Kevin Gallagher
    • This is his first chance to see a WRD office in action.
    • Local [District] offices are not always exposed to pressures coming from Washington.
    • Explained how Clinger Cohen Act is forcing Federal agencies to "think enterprise".
    • Bureau IT Issues (a.k.a. Enterprise Initiatives):
      • Budget cuts for 04 -- The Office of Management and Budget (OMB) pressure- DOI got $166M cut in IT. These cuts are seemingly random, not related to OMB 300 Process. USGS has to figure out how to cut 12.2M out of IT.
      • ITMR Study -- Applying best practices and private sector benchmark to DOI IT, such as consolidation of servers and services and mass purchase program. Kevin volunteered to be part of the group that will develop the acquisition contract for mass purchases. His main goal is avoiding purchases of antiquated equipment. Bureau has been very proactive in acquiring exemptions for scientific equipment and setting up waiver process. Once the acquisition contract is in place the freeze will be lifted and people will purchase equipment from the contract.
      • Network SecurityDrivers:
        • Federal IT Security Reform
        • KPMG Audit- auditing financial systems
        • IG Security Audit
        • COBELL law suit agains DOI
        • DOI Memos
        • DOI Perimeter Security Plan
        • SAIC Score card- DOI hired SAIC who graded USGS on security. The USGS accounted for over half of the vulnerabilities in the Department. Bureau Network Security Project will address these vulnerabilities. We need to patch servers, build DMZs, consolidate servers, and obtain OMB A130 accreditation.

      • Microsoft Enterprise Agreement -- 3-year but will probably be renewed once the agency standardizes.
      • Centralized deployment of Active Directory -- DOI was initially very aggressive in pushing for a centralized deployment. The Bureau knew from the beginning it would be difficult to implement but had to participate. Recently, last week, there has been a realization by the DOI that the network infrastructure is not in place and they Decided to take phased approach.
      • DOI Secretarial Order -- Mandates that all Bureau develop an IT Capital Planning Process. Kevin suggested that the GIO form a Capital Investment Board to make IT investment decisions. He hopes that this board will make cuts at the HQ level, among projects like Lotus, Enterprise Web, etc. and not at the cost center level.

  • DIS Office update -- Tom Wood -- First/last visit to PR was in 1985 teaching Info.
    • DIS responsible for NatWeb, water.usgs.gov, Field Computer Project, OI Cyber seminars. Due to the IT reorganization, several people have been transferred to GIO office and several other people have been transferred in to the DIS Program Office.
    • DIS will deliver media for several MS EA software packages to all WRD offices.
    • NT TAC supporting local AD model but participating in testing of centralized model.
    • DMZ- impact on District- if you want to continue providing public services you will need to separate servers that provide public services and get additional hardware (a firewall) to implement a DMZ.
    • DIS coordinates SPLUS training and Maintains Electronic Forms templates.

  • NWIS Status (5 minutes) -- Susan Trapanese
    • 4.3 release beta testing late February -- bug fixes to ADAPS, GWSI and NWIS. UV editing will be turned back on in Hydra/ADAPS. SWUDS is being beta tested at 3 districts.
    • NWIS RT -- Susan explained importance of NWISRT system to the PR office. There is a second part to this project that will serve redundant mirroring of NWISWeb servers. "What is needed to process NWIS data is totally different than what is needed to process NWISWeb data". Announced availability of cyberseminars in March.

  • Questions and Answers with District Staff (Jessica Alvarez capturing notes):
    1. When will IT Freeze be lifted? What is the estimated timeframe?
      DOI has an aggressive timeframe of 2 months but Kevin does not see it happening. In the mean time use the emergency waiver process if the equipment is not on the exemption list.
    2. When will we be able to serve longer periods of unit value data and more daily values data (other than the current 1.5 years or historic streamflow)? -- PR needs to serve longer periods of water records to show extended drought. For example 10 years of data.
      Susan's reply:   period of record for published daily values (all parameters) is the number one requested enhancement to NWISWeb. This enhancement will require work from both NWIS and NWISWeb teams who are currently concentrating on completing the NWIS RT project and beginning their "getting-off-the-treadmill" tasks. For Unit Value (UV) data, OSW is investigating strategies to put "historic" UVs on another server and link it to NWIS Web; NWISWeb would continue to serve "current" UV data. Although this historical uv "archive" will utilize NWIS extraction routines and metadata for linkages to NWIS databases, the archive can be implemented "outside" of NWIS/NWISWeb so that NWIS won't have an additional system/service to manage.
    3. What is the status of dumping NWIS data into STORET -- USGS and EPA are meeting again. What is on the table now is that districts/USGS will not be required to put data into STORET (depending on the terms of individual district agreements with coop partners). USGS and EPA have agreed that dumping data into STORET is not the way to go. Instead we should provide a service for users to come to a portal to access water quality data from either USGS or EPA (and potentially other entities) and the data would be described in a similar manner. We are back at the table trying to figure out how to do this. Prototyping for this portal has already begun. A Team is being put together to develop an overall plan with "phased" implementation. One of the team's first tasks (and most challenging) is to map/relate the USGS and EPA water quality data/information to a common logical "view".
    4. When will we see detailed reports from BASIS+ ? --
      Katherine commented that BASIS+ is a moving target that is out of our control. AOs are forwarding concerns through conference calls with Gene Summerhill. Our concerns are now going up a level, to Carol Aten. Mindy Lanza will be going on detail to help them develop policy and the business processes handbook and to work with the BASIS+ team on reports and system enhancements. This gives us an opportunity to pass on WRD reporting needs. Her detail will hopefully allow WRD to request that BASIS expects fixes or find an alternate temporary solution.
    5. Is the rumor true, that Interior plans to develop a department-wide financial system?
      Kevin says an initiative is on its way. A Request for Information (RIF) is being done, very early stages. This will not be anytime soon, maybe 2 to 3 years down the road.
    6. Is there any movement to provide windows clients for NWIS?   We have the MS EA in place and we are running windows but NWIS is not on Windows.
      Susan: SWUDS is such a client. NWIS has discussed how they might approach a migration of a client. Two small pilots, using technical consultants, are in place to explore developing NWIS applications in Java -- the pilot applications are Peak flow and site visit. Although the goal of these pilots is to gain practical experience and to document new development techniques, the peakflow pilot will produce a "finished/approved" NWIS software application that will replace the existing peakflow ADAPs application. Although the development is Java, these pilot applications will not be browser based.
    7. Is Advanced Directory (AD) really the greatest thing since sliced bread?
      Paul:   Most of the benefit is for the SA, not having students running around doing updates. Benefit for traveling users will be access to resources at other offices without SA intervention.
      Nelson:   it will primarily benefit managers who travel a lot.
      Jim:   two things we have to answer; 1) does a centralized implementation make sense as a business practice and; 2) what happens if we can't connect, problems presented in John's presentation need to be resolved.
      Jessie:   It will give top level IT managaers control to hold-on/secure the OS on Windows host and allow them to easily produce reports to show DOI how secure Windows systems are.

Expected Outcome:   Discussion

11:30 am

LUNCH

12:30 pm

Real-Time Flood Alert System (RTFAST)
Presented by:   Dianne Lopez, Computer Specialist, Guaynabo, PR
Meeting Notes follow:

  • Java based
  • Developed as part of FEMA agreement. Funded by CINDI.
  • 40 radio transmitted station maintained by PREMA.
  • Main driver was the need to know flood stages within minutes or hours.
  • Most cooperators use ADAPS to get info but learning curve is high.
  • Program was written to integrate different sources of information from different agencies.
  • RTFAST's Interbase database is maintained at PR District.
  • Only 3 months of data is kept in db because emergency management agencies are not concerned with historical data.
  • Program features:
    • Calculates cumulative rainfall and rainfall intensity
    • Produces hydrographs of stage and discharge
    • Allows user to compare an existing even with a known previous event. Currently 2-yr and 10 yr events currently available.
    • Cooperators can choose data to be viewed by station number or station name or by basin.
    • They can choose to view data in increments of 15min to one hour.
    • When plotting numerous stations, if one is out of "whack" it can be turned off so that it does not affect the plotting of the other stations. The graph will automatically adjust.

  • Future plans -- to work on automating station updates from NWIS to RTFAST. Currently it has to be done manually. She has NWIS server setup to ftp data to her database, just like it ftps data to the NWISWeb server.

Expected Outcome:   Discussion

12:45 pm

ITAC Discussion of Town Meeting and Issues
Presented by:   ITAC Members

Expected Outcome:   Ensure Caribbean District needs are heard and addressed during the ITAC meeting.

Insights from Town meeting:

  • Frustrations with number of Bureau, Headquarters, and Information Technology specific acronyms -- hit with too many.
    -- Offer a chance to learn what acronyms mean as a follow-up. Spell out acronyms in minutes.
  • Concerned about lack of questions -- hope presentations were understood.
  • A note will be sent to District offering contact with ITAC during the next 2 days.
  • Jessica recorded 7 questions which were discussed during meeting:
    • We let them have an idea of issues that ITAC does discuss.
      -- Walked away with idea of broader issues
    • We need to make certain District staff has enough time to ask questions, but information dialog among ITAC members was informative.
    • Consider getting a sense of what they would like to know before starting presentations.
    • Matt feels presentations were fine and challenging to the audience.
      • He heard very little "Reston-speak" (aka TQM junk)
      • Only requested tuning to District needs and reactions in the the future and not scrap what was done.

    • Send e-mail to District Chief highlighting types of questions asked by other Districts.

1:30 pm

Expectations of meeting (brainstorming session)
Presented by:   ITAC Members
Expected Outcome:   ITAC member interaction

List of Expectations follow:

  • Communicate (educate) CTO about WRD issues. Kevin to come away with understanding of what ITAC is be about:
    • Don't just complain -- demonstrate how we can be effective for WRD and USGS.
    • Make him aware that we have talented people in every District -- and how ITAC is used to do maintain senior staff abreast of District IT strengths and weaknesses.

  • Problems with Basis+ and feedback -- continue to explain problems and ask for solutions.
    • We do not know our budgets and close out will be a true issue.
    • Personnel costs and possible deficit or surplus discovered late in the year.
    • Suggested to consider turning on a minimum number of reports.

  • Cut across issues within ITAC.
  • Easy to be negative towards the Bureau and WRD; managers and ITAC need to accentuate the positives.
    • Example:   IT freeze and budget -- field people still know our mission

  • Looking how databases will change in the future.
  • Discussion about IT competitive sourcing. Can ITAC help?
  • Provide feedback to District.
  •   (Feb2003.PR.23)   Jessica Alvarez -- will write down 7 questions from the Town Hall meeting and provide the answers (after verification) to District.

  • Should have brought up mobile computing at town meeting (but Charlie is not here)
    • Charlie wants to know what to do considering no budget
    • Consider line item in budget to modernize operations (data collection)

  • Better communication across the areas (field v. AO v etc)
  • Support for direction memorandum for AD -- discussion and feedback.
  • Feedback on AD and NWIS and future goals from this cross-cutting part of group.
  • Educate new ITAC members as to the function of ITAC and what can we influence (reference the Troy, NY meeting and discussion session).
  • Recovery cost of enterprise agreement calculated to be $200 per FTE per site.
    • Remind Districts of this cost

  • South Carolina and Tennessee District are both in dire straights.
    • Furlough in both and possible TN RIF early next year
    • Cost recovery on top of this
    • How do we get the word out to assist?

  • Get reality considered at DOI.
  • Talk to Congress and figure out how to do it
  • NWIS, NWIS-Web, field computing and other WRD specific issues need to be constantly addressed to continue to have good products through these difficult times.

2:00 pm

BREAK

2:30 pm

OLD BUSINESS:

  • Review Action Items from previous meetings
  • Presented by:   Brian McCallum
    Expected Outcome:   Progress update.

    Action item discussion deferred to next meeting/conference call in order to keep agenda on schedule. ITAC members have been focusing on this meetings organization leaving little time to address Action Items as of last conference call one month ago.

3:00 pm

NEW BUSINESS:

  • FY 2003 ITAC Goals
  • Presented by:   Brian McCallum
    Expected Outcome:   Approval of FY 2003 goals

    Meeting notes follow:
    Goals listed as distributed by Brian to make certain they are relevant:

    • Goal 1 -- approved (change Active Domain to Active Directory)
    • Goal 2 -- approved
    • Goal 3 -- approved with the following change:
      change "institutionalize the mobile computer effort" in first bullet,
      to "facilitate the design of the field mobile computer effort implementation plan"

    Goals for FY2003 were approved with changes as noted above.

  • ITAC Charter Revisions
  • Presented by:   Brian McCallum & Katherine Lins
    Expected Outcome:   Approval of Charter Revisions

    Katherine discussed some revisions and logic behind those revisions. Current version is posted to ITAC website and changes are in blue font.

  • Election of ITAC Vice-Chair
  • Presented by:   Brian McCallum
    Expected Outcome:   election of Vice-Chair.

    Sonya Jones was elected as ITAC Vice-Chair.

  • Awards to previous members & Chair
  • Presented by:   Brian McCallum / Charlie Merk

      (Feb2003.PR.24)   Katherine Lins - will present awards to previous members and Chairs. -- Recognition and appreciation letter to be written by Katherine Lins and signed Bob Hirsch for all out-going members and the Chair. Non-monetary awards to be considered for the outgoing Chair.

4:00 pm

Oracle Possibilities in WRD
Presented by:   Harry House

Topic/Subject Matter:   I will review some of the capabilities of Oracle systems that I feel are most immediately relevant to WRD generally. As I am not intimately familiar with the major data systems currently being deployed in WRD, and the challanges they face, I will NOT go into much detail regarding specific applications of the Oracle technology to those systems. It is my opinion that there is a tremendous lack of understanding and appreciation in WRD and USGS in general in relation to the power and potential of the currently licensed Oracle software we have in hand. The primary goal of the talk will be to provide an initial enlightenment of our IT staff to that end.

Why it is important:   For IT personnel and managers to understand this because of the potential cost savings and improved efficiencies that could be realized by replacing or augmenting current methods and systems with selected applications using the Oracle technology stack.

Expected Outcome:   I would expect ITAC personnel to have a fuller appreciation for what Oracle brings to the agency. I would expect this will be an opportunity for ITAC to ask questions throughout the conference to further enhance their knowledge. I do not anticipate any direct action items to come out of this presentation. That said, I believe some action should be taken to ensure that there is additional education regarding this product going forward. An enterprise structure should be configured around existing and new deployments to ensure easier data sharing and integration nationally. I believe both of these efforts will require specific personnel assigned to these tasks.

  (Feb2003.PR.25)   Tom Wood - will get costs and a handle on what we are paying for data bases. We already own SQL servers, Ingres, Oracle, and Access. Do not buy another and until we understand what we already own. -- Start talk about what should be communicated ... who supports Oracle at the Bureau level?

  (Feb2003.PR.26)   Tom Wood & Jessica Alvarez - need to get the word out to Project Chiefs as they are relying on local resources.

Additional discussion notes:   Kevin expands on his experience with database management:

  • Centralizing Oracle servers raises many possibilities, for example, more cost effective for Districts.
  • When one compares databases, there is no clear winner.
    • SQL Server lighter while Oracle can do more but is heavier.
    • Coast Guard decided that databases needed to be web based and centralized.
    • Oracle was used for warehousing.
    • Local database selection was based on what the developers knew.
    • Moving data from a variety of locat databases into the Warehouse was "piece of cake" using XML, etc.
    • Coming to agreement on schema is most important (data model).

  • While enforcing a data model brings efficiencies to the Enterprise, sometimes you can't get there.
  • Centralization (comes at a cost but has its trade-off).
  • Warehousing requires heavier tools such as Oracle.

  (Feb2003.PR.27)   ITAC members - will consider a standard data model for the simple things (date, time, etc.)

NWIS will communicate what they are doing about data models and bring in someone for Oracle. Not an action item at this time. NWIS believes most sites end up adopting their existing data model when designing local databases.

5:00 pm

Review of Action Items from the day
Presented by:   Brian McCallum & Charlie Merk
Expected Outcome:   Documented list of action items

5:15 pm

ADJOURN for the day

Wednesday, February 12, 2003

Time

Agenda Item, Presenter(s), & Expected Outcome

7:30 am

Description of the DOI Enterprise Agreement with Microsoft

  • Implications of this agreement, along with a status report on testing and distribution of the software, will be presented.
  • Paul Exter is the WRD Site Administrator, Maryland District, and Bureau representative for MS Enterprise Agreement with DOI.
Presented by:   Paul Exter
Expected Outcome:   Communication of impact on WRD

Meeting notes follow:   See http://nttac.usgs.gov/os/xp.

  • MS Enterprise Agreement - 3 yr contract of $6.2 M for 8,450 USGS enterprise desktops [with office and lotus on them]. Field laptops, thin clients, and UNIX desktops are not included. This contract includes current version of office and upgrade license to current version of windows. Does not include Publisher FrontPage. Although we still have license to FrontPage 2000 version. Work at home licenses not included for XP, but still ok for Office 2000. $1.6 M is the FY03 cost.
  • Only have 26 copies of SMS and 6 copies of SQL server [it is required for SMS] and 600 copies of MOM [requires SMS and SQL], so those will not be distributed at this time.
  • We have a brewing problem with the cost of true-up being a pay-up front fee for all 3 years.
  • Nelson:   Its important to distinguish between Enterprise desktop and scientific desktop when report number to DOI. If DOI thinks we saved xx $ million with this contract, it might be considered an IT budget reduction, yet it did not save WRD money, because we would not have purchased these numbers this early.
  • Active Directory - ITAC members debate cost/benefit of local vs. centralized, especially over Paul's slides on pros and cons. Paul seeks ITAC support for proceeding with AD. Suggestions on how to proceed:
    1. Form AD Integration Project Team, to include workers on ADA, Network, and Security Teams. Abolish ADA Team. WRD must fund representatives on the AD Integrated project Team (ADIP).
    2. Continue testing and learning AD, documenting how to deploy locally with minimal pain if we must convert to centralized deployment, later.
    3. Support offices that have already deployed centralized, and support those who have deployed and will deploy localized.

Action Items:

      (Feb2003.PR.1)   Kevin: - to request that FIP guidelines be modified to state that servers should be purchased without an "Operating System (OS)".
      (Feb2003.PR.2)   Paul: - will research if MOM requires SQL and send email to ITAC.
      (Feb2003.PR.3)   Paul: - will ensure "all employee" distribution email sent out by GIO and EROS should say DIS distributing CD's to WRD.
      (Feb2003.PR.4)   Nelson, Grady, Scott, and Sandy: - will work up numbers to show that we did not have real savings [cost avoidance] .
      (Feb2003.PR.5)   Greg: - Geodatabase support for GIS by either MS SQL or Oracle needs to be addressed by some WRD group. Greg will nominate people for the group.
      (Feb2003.PR.6)   Paul: - will provide his draft recommendation to ITAC. Jim Bettandorff and others will modify it for ITAC ratification.

8:30 am

Departmental Mandate to Implement Active Directory

  • An update on the Department of Interior (DOI) efforts to mandate and implement one centralized active directory structure for all DOI bureaus. This will include a status report on preliminary work, and work remaining to be done prior to implementation.
  • Kevin Gallagher is the USGS GIO Chief Technology Officer.
Presented by:   Kevin Gallagher
Expected Outcome:   Communication of impact to WRD

Meeting notes follow:

  • See { PowerPoint from Paul }
  • 10-17-02 DOI says all Bureaus on single AD by 12/04. Bureau reps asked for business case and pointed out our network will not support it.
  • 12-5-02 DOI says all Bureaus each on separate AD by 12/04
  • 1-31-03 AD at bureau discretions with common schema, naming, etc. DOI intranet time frame 6-12 mo. With 10.x internal IP's
  • 4 phases are all pilots includes Interior building and Grace Hall in AK -- all on XP.
  • Our current hardware firewalls are between bureaus [and Disciplines] and will not let AD happen easily.
  • DOI core team meets monthly in Denver.
  • WRD has a volunteer group working out standards and plans and piloting. See NTTAC pages under windows 2000 server.
  • BLM has approximately the same number of employees and offices with only 20 domain controllers.

Suggestions from Paul Exter:

  • Have GIO come to an official statement on Centralized Advanced Directory - Investigate AD, or decide to hold off at this time.
  • If Investigate:
    1. Put together AD IPT (Integrated Project Team)
    2. Have representation from GS ADA (subset), plus all other IT areas.
    3. Decide how to fund these people to do this work.
    4. Adopt the below documents as a beginning step and present to GIO cost, process needed, etc. to Implement AD.

  • AD Documents from Paul:

9:15 pm

BREAK

9:30 am

DIS IT Infrastructure Direction Memo on Active Directory

  • Implementation within WRD
Presented by:   Tom Wood, Chief, DIS Program Office

Draft action item prior to meeting:   Tom will make necessary adjustments to the DIS IT Infrastructure Direction memo on Active Directory Implementation within WRD. Tom will provide the revised memo to ITAC and CTO for a final review by xx/xx, with comments due by xx/xx. Tom will send the memo to all WRD employees.

Expected Outcome:   Draft memo will be provided to ITAC and CTO during the week of Feb 3. ITAC and CTO will come to the meeting prepared with any clarification questions/concerns. The memo will be discussed and a decision will be made on whether ITAC and the CTO will support the release of the memo.

ITAC questions:   Deployment costs? Operation costs and server purchases.

ITAC suggestions:   Motion to accept. Passed. CTO concurs.
Suggested additions:   Add "... and pilot testing..." to the second bullet under "Centralized/Bureau Managed AD Deployments". Also, vet with RGIOs before sending out.

  (Feb2003.PR.21)   Tom Wood - will incorporate the suggested addition, vet the memo with the RGIOs, and send the memo to all WRD, cc to GIO and RGIO.
Status:   IT Direction Memo #14 was emailed by Tom to all WRD employees on 2/24/03.

10:00 am

IT Issues Roundtable Q&A

  1. IT outsourcing -- In USGS, IT is not a speculative target until FY 05, and has not been "declared." GAO is still interpreting guidelines. Based on Greg's knowledge of the process, it seems helpful at some point in the future to compile a list of functions and business practices.
Presented by:   ITAC Members, Kevin Gallagher, Paul Exter
Reference doc:  Clarification - IT Hardware Freeze
Expected Outcome:   Clarifications of IT Issues

11:30 am

LUNCH

12:30 pm

Lotus Notes Issues

  • Size limitation/constraint issues
  • How are sizes enforced (i.e., no more emails)
  • No Customer Advisory Board for Lotus issues
  • Vulnerabilities
  • Presented by:   Sandy Williamson

    Expected Outcome:   ITAC recommendation for creation of customer advisory committee in written document.

    Sandy presented 4 recommendations he'd like ITAC to propose to Lotus:

    1. Create Customer Advisory Board or User Group -- In principle, Kevin agrees and will discuss with Karen.
    2. Formalize Lotus support group staff at the Bureau level/
    3. Change disk space limit.
    4. Change space limit enforcement mechanism -- to "can't send" vs. "can't receive."

    Graig McHendrie recommends replication for anyone who archives. Overall replication yields better performance plus email database will always be available to user if on laptop.

      (Feb2003.PR.20)   Katherine Lins - will forward, to Kevin Gallagher, through Bob Hirsch, Sandy's "Draft Recommendations from ITAC about Lotus" with modifications as stated by Katherine and agreed to by ITAC.

1:30 pm

NatWeb Migration by WRD:

  • Should ITAC officially encourage districts to migrate from local web servers to NatWeb?
  • A brief list of important pros and cons of migrating to NatWeb will be presented. This list will be written using the experiences of at least two sites that have already made the transition. A recommendation on whether or not ITAC should endorse NatWeb, based on the findings, will be submitted for discussion.
  • This session should conclude with a vote on the issue, and a resulting recommendation for distribution to District Chiefs and District webmasters.
Presented by:   Nelson Williams

Expected Outcome:   ITAC endorsement on direction for WRD migration to NatWeb.

Nelson's proposal is:   "ITAC recommends that districts migrate their web pages and web applications to NatWeb." Ref Nelson's proposal (1/31/2003 e-mail from Nelson to ITAC) for details and notes to the recommendation.

The NatWeb Team is soliciting IIS expertise -- Brian Reece, Gary Lebing, and others -- to solve the problem of integrating IIS services into NatWeb. Lorna concurs that PHP and MySQL be likewise solved by NatWeb.

ITAC Decision:   Motion to accept Nelson's proposal passed unanimously, with amendments:

  1. With the network security project announced by Chip Groat, it is probable that public access to public Web pages will be cut off within months away.
  2. ArcIMS and associated data base access issues need to be solved, whether by NatWeb or DMZs. (Tabled is the ArcIMS issue for later resolution).

  (Feb2003.PR.22)   Nelson Willams and Lorna Schmid - will draft letter for Katherine to review and send, informing districts of ITAC's endorsement of the "NatWeb Migration by WRD" proposal.

2:30 pm

BREAK

3:00 pm

BASIS Plus issues

  • Access to fiscal reports
  • Consolidation of Florida Subdistrict issues
Presented by:   Debra Tracey

Reference handouts:

  1. CR Concerns with BASIS+ Implementation memorandum dated 2/6/03
  2. Letter from NORDICS dated 1/29/03 -- to alert you to the serious adverse impacts on District programs of the implementation of BASIS+ in FY03, and to invite Eastern Region and Headquarters management to meet with us to try to determine appropriate ways to address the issues raised in this letter.
  3. Draft letter to Bonnie McGregor dated 2/11/03.

Expected Outcome:   ITAC recognizes that District Chiefs and AOs are documenting issues in letters being forwarded to RD's and Carol Aten (e.g. NR DC's letter). These letters might lack adequate specificity, but point out the fact that current reports are not adequate for a cost center to determine it's financial status. Expenditure info is in FFS; funding estimates in BASIS+ have not yet been transferred to FFS. Monthly FFS reports, as provided now, are not adequate, timewise. Reports to consolidate info from both data bases is not available.

Meeting discussion follows:   Oracle Discoverer can access BASIS+, but does not yet have that access. Bob Hudson has solicited from the SR AOs the top reports needed, and will provide this info to Bonnie McGregor. BASIS+ staff have prioritized their list of reports to develop.

BASIS+ is working on some of these issues, but we don't know when the improvements will be available.

ITAC struggles with how to help. Options include:

  • Identify the appropriate tool (Crystal Reports, Oracle Discoverer?) and expertise to develop interim reports from FFS and/or BASIS+
  • Recommend that AIS be re-enabled as an interim solution, at least for salary reports; however, can AIS still acquire all the necessary info from FFS?

Upon discussion of the current status, ITAC is not prepared to make a recommendation for additional resources. There is no available technical solution within WRD to recommend for this particular problem.

4:00 pm

Enterprise Web Update
Presented by:   Greg Allord
Expected Outcome:   Information Exchange
--- This presentation was postponed to next meeting, we need a speaker from the GIO.

4:15 pm

Review of Action Items from the day
Presented by:   Brian McCallum & Charlie Merk
Expected Outcome:   Documented list of action items

4:30 pm

ADJOURN for the day

Thursday, February 13, 2003

Time

Agenda Item, Presenter(s), & Expected Outcome

8:00 am

NWIS Future Plans
Presented by:   Susan Trapanese, Chief of NWIS

Meeting Notes follow:   Reference NWIS Status notes. Susan shared highlights of the NWIS 4.3 release, SWUDS status, and NWIS-RT. In order to provide a district backup service from NWIS-RT, NWIS4.3 must be installed on the district NWIS servers. RCSers and Rgnl SW Specialists will review assignment and "rollout" schedule of districts to NWIS-RT servers. NWISWeb/NatWeb teams have been testing replacement methods for the ftp-ing of files from NWIS hosts to the NWISWeb/NatWeb systems. Rsync was the selected method, of 4 methods studied.

Sniff-Spikes may be expanded to include other real-time parameters (water quality, reservoir levels, ground-water levels). Help needed from discipline specialists to define thresholds for these parameters. Need was discussed for better tools to review thresholds, because too many invalid data are passing through to NWISWeb. The NWIS User groups (a subgroup called the technical integration group) are working through these issues (including enhancements to ADAPS for real-time data QA).

Susan listed the "get off the treadmill" activities, which includes an overall architectural strategy.not just an assessment of a port to Oracle. However, regarding Oracle issues, Steve Brady is discussing matters with Harry House. Oracle consultants will be required for technical details such as replication. Of note is that NWIS has not yet been able to start the "off the treadmill" process. Other activities include mentoring replacements for key staff. For instance, Jim Cornwall is being mentored by Scott Bartholoma and Ernest Dreyer.

Expected Outcome:   Update for ITAC members. Discussion of concerns from field.

8:30 am

NWIS Communication Process

Presented by:   Susan Trapanese

Meeting Notes follow:   Susan displayed her "Stakeholders-diagram.doc" showing interaction between NWIS and its various stakeholder groups. End users can communicate their requirements through any of the appropriate stakeholder groups, as well as through GNATS.

Regarding the proposed External Users User Group and the Program Management Needs and OFA Partnerships, Bill Horak pointed out the vital need to give greater weight to state cooperator needs.those stakeholders who support us fiscally and before Congress, in contrast to OFAs (e.g. NWS) who provide little support in either category. We also need to recognize the constituents who mine our data and use NWISWeb heavily.

Expected Outcome:   Clarification of communication process to submit enhancements and bugs

9:00 am

Consolidating ftp servers in WRD
Presented by:   Jessica Alvarez

Background Information/Importance:   Back in November the courts ordered the Department of Interior to discontinue the use of anonomyous ftp. The USGS response was, in summary, such a measure would at this point partially paralyze our operations. NWIS and the NWQL are almost ready to replace ftp with sftp but individual Districts have not yet started to consider the use of a centralized ftp server. Lorna Schmid had suggested using the NatWeb servers, placed in a DMZ (secure demilitarized zone) as the central ftp servers.

Meeting Notes follow:   Reference:   Consolidation of ftp servers (pdf) presentation. USGS is not in compliance with (draft) DOI Perimeter Security minimum firewall configuration mandate (Ref appendix 1), requiring USGS to reduce its FTP servers. Every office will need a DMZ and a waiver to continue using READ-ONLY anonymous FTP. There are other unsolved needs and problems.

We need to understand DOI requirements, as well as our requirements. FTP access will be allowed from internal network to the Internet. Sensitive information must be encrypted when transferred. No external FTP access will be allowed through the USGS firewall to FTP servers within DOI's trusted/private network. FTP traffic between USGS sites will not be allowed, unless the FTP server is in a the DMZ. Anonymous FTP servers are not allowed, site may get a waiver for READ-ONLY anonymous ftp servers, after adequately secured.

Expected Outcome:   ITAC needs to determine how removing ftp servers from individual offices will affect Districts and work with Lorna on defining a timeline and process to consolidate servers.

Action Items:

  1.   (Feb2003.PR.7)   ITAC Members: - Prior to meeting -- Access difficulty of moving to sftp. Query sites to find concerns and define possible problems. Line up assistance with either Sun Tac or NatWeb group.
    During meeting -- Make a decision and recommendation on how sites should proceed.
  2.   (Feb2003.PR.8)   Tom Wood - will send a "request for comment" (RFC) to district SAs and Webmasters including the problem, draft ftp requirements list, and solicit district comment on the requirements. ITAC members will share the RFC with their constituents as well. DIS will consolidate all input and coordinate results and funding needs with Kevin Gallagher.
  3.   (Feb2003.PR.9)   Kevin Gallagher - will share Jessie's presentation with Stu Mitchell, will seek clarification for our assumptions and proposed solutions, and will report back to GS-W ITAC and others, as appropriate.
  4.   (Feb2003.PR.10)   Kevin Gallagher - will have Mike McNally request that DOI allow USGS to use anonymous ftp "read-only" from a DMZ, without having to request waivers.
  5.   (Feb2003.PR.11)   Lorna Schmid, Tom Wood, Jessie Alvarez, and Kevin Gallagher - will coordinate the groups that need to come together to provide the technical solutions to the anonymous FTP, ArcIMS, and related issues.

Suggestions:   The solution for cooperators is to allow them vpn access. Kevin feels that the USGS VPN service will meet this need and just needs some fine tuning of Web page.

9:30 am

BREAK

10:00 am

WRD Publications Update
Presented by:   Greg Allord

Meeting Notes follow:   Reference { insert Greg's powerpoint here } . In addition to lots of details in the powerpoint, Greg rapidly described an impressive array of activities and initiatives, that are not recorded. { Greg, provide URL } . USGS Product Warehouse Simple Search is operational. A spatial interface is under development. Search capabilities will advance from searches of abstracts to full content searches of all reports.

All information products must be on the Web. All interpretive info must have Director's approval. The Product Warehouse will manage the central collection of on-line reports (pubs.usgs.gov). Standard procedures will be developed for "versioning" of reports, including association of errata with each version of a report.

All 32,000 Open File and WRI's, including plates, are being scanned in (OCR) by Denver Warehouse contractors.

Web sites managed by authors that do not receive proper approval or that present interpretive information that is not properly document are unacceptable. Solutions are being studied.

Workflow -- In Design and FrameMaker are the supported page layout packages. Other software in the USGS Publishing Core Package are Illustrator (785), Photoshop (564)

Acrobat (), and Go Live, although DreamWeaver is certainly a viable alternative. Greg's CLP program has saved DOI nearly $2M (saved USGS $1M). Software maintenance is very important and needs to be purchased with these products. It's inexpensive, at $156.30 for one year of maintenance for all CLP products for one pubs professional; without software maintenance, the upgrade costs are over $1K.

Publications serving is moving into the database arena. ITAC help is needed to identify future publishing technologies and selection criteria/process, facilitating standardization, training methods (including on-line version of DreamWeaver vs. GoLive recommendation needed).

"Introduction to USGS Hydrologic Reports", 20 hours.

Expected Outcome:   Information Exchange

  1.   (Feb2003.PR.12)   Katherine - will send a June e-mail to districts presenting Greg's cost savings research and recommending that districts purchase of maintenance with/for all CLP publishing software.
  2. Related Documents:

    1. reports discussion
    2. web design products review.
    3. GoLive Real World Adobe GoLive 6 Jeff Carlson, Glenn Fleishman.htm
    4. PC Magazine reviews Dreamweaver 4.htm

  3.   (Feb2003.PR.13)   Tom Wood - will pursue a discounted contract for DreamWeaver.
  4.   (Feb2003.PR.14)   Kevin Gallagher - will ask Alan Davidson to work with Greg Allord, Harry House, and Sandy Williamson to explore Oracle solutions for needs that Greg and Sandy envision.

10:45 am

Review/Finalization of Action Items from entire meeting
Presented by:   Brian McCallum/Charlie Merk
Expected Outcome:   Documented list of   action items   for entire meeting.

11:15 am

Preparation for upcoming conference calls/meetings
Presented by:   Brian McCallum
Expected Outcome:   Katherine and Brian feel that meeting in June is not a good idea this year; instead, a two half-day CyberSeminar will be organized in place of the meeting.

  1.   (Feb2003.PR.15)   Jessie Alvarez - will prepare an issues/solutions presentation for the February ITAC conference call.
  2.   (Feb2003.PR.16)   Debbie Tracy and Grady Moore - are assigned the task of defining issues with TMS and proposing correction. Consider involving Diane Jeffries and inviting her participation when this issues is brought before ITAC in the April conference call.
  3.   (Feb2003.PR.17)   All ITAC notetakers - will send their minutes to Ruth for posting. Presenters are to send their powerpoint files to Ruth also for posting.
  4.   (Feb2003.PR.18)   All ITAC members - are to share ITAC meeting highlights with their constituents.
  5.   (Feb2003.PR.19)   Jessie Alvarez and Margaret Bunch - will help create Lotus abbrevs for ER and WR studies chiefs, respectively.

The Puerto Rico District extended their thanks to ITAC for visiting the District and interacting with the PR District staff.

11:30 am

ADJOURN Meeting

  • Streamgaging station field trip (Optional)


Click on a major heading to other links!

TOP #top ITAC home /usgs/itac/ Caribbean Meeting 030211PR_logistics.html

Address questions or comments to
Charles Merk, cfmerk@usgs.gov,
ITAC Secretary, on 703-648-5680



URL for this document is http://water.usgs.gov/usgs/itac/minutes/030211PR_agenda.html
If you have any questions or comments about this document contact ITAC Webmaster
Last modified: Wed Jan 15, 2003 11:07:43 EST