Attendees
Brian McCallum, Co-Chair |
Data Chief, Atlanta, GA |
Jessica Alvarez |
Regional Computer Specialist (NR), Reston, VA |
Steve Blanchard |
OI Chief, Reston, VA |
Steve Glodt |
NWQL Representative Denver, CO |
Isabelle Halley |
Acting Chief, NWIS, Reston, VA |
Joel Johnson |
Data Base Management Systems, Sacramento, CA |
Sonya Jones |
Studies Section Chief, Austin, TX |
Loren Kloft |
Site Administrator, Louisville, KY |
Charlie Merk |
ITAC Secretary, Reston, VA |
Grady Moore |
District Chief, Troy, NY |
Gary Neverdon |
Chief DIS (Alternate), Reston, VA |
Mark Nilles |
Discipline Office, Denver, CO |
Pat Vallance |
Administrative Officer, Tucson, AZ |
Nelson Williams |
World Wide Web Development, Raleigh, NC |
Sandy Williamson |
National Water Quality Assessment, Tacoma, WA |
|
Tuesday, May 14, 2002 |
Time |
Agenda Item |
8:00 AM |
Welcome and Introductions were made by Brian McCallum, ITAC Co-Chair person, and
Grady Moore, New York District Chief.
- Introductions (All Members)
- ITAC Membership
|
8:10 AM |
All Members discussed their "Expectations and Concerns" for this ITAC Meeting
- Impact of Information Architecture Committee and Feedback
- Network improvement with respect to cyber seminar
- ***** Role of ITAC and relevant communications channel
- Office of Information Issues and Feedback
- * Recommend improved communication with GIO Office and Groups
(e.g., Security Chain of Command)
- VBNS Upgrade does not support redundancy of WRD Network - Action Need
- Telecommunications Cost - Determine Pros and Cons of offices going with
their own ISP
- * Slowness of water.usgs.gov
- DIS Support suggestions solicited from ITAC
- Basis Plus - Concerned about single point of failure
- NWIS Historic Data rounding issues
- Update on NWIS Graphics
- Centralization of (Information) activities in Bureau
- Committees' Representation -- Advocacy
- Competitive Sourcing with respect to computer personnel
- Cyber Seminar Quality
- Training Management System
- Suggest new name for District Chief; such as New York Director for
Water Programs
- Annual ITAC Report and ITAC Communication
|
8:20 AM |
Brian McCallum reviewed the Agenda and Goals for this meeting with all ITAC members.
|
8:30 AM |
Brian McCallum reviewed the Action Items from previous meetings. |
8:45 AM |
Steve Blanchard presented the following update on the the Bureau and the Office of
Information IT/IM Re-0rganization Change Status -- to the ITAC members:
- Water Resource Discipline Changes:
- Office of Surface Water Assistant Chief is advertised.
- Office of Ground Water Chief will be vacant when Bill Alley
transfers to the field. Vacancy announcement will be out.
- Southeast Regional Hydrologist vacancy is at DOI for approval
- Office of Information Changes
- Office of Information Changes:
- In the OI Customer Relations and Communications Program --
Rebecca Bruno and July Salvo transferred to ER Office of
Communications -- but did not take their work with them.
Rebecca prepared the AD for Water presentations. Judy Salvo's
departure leaves void for setting up WRD exhibits.
- In the Distributed Information System
Program Office -- Bob Wakelee and Jack Yost for telecommunications
and Mike McNally for security transferred as permanent detail to GIO
but WRD pays salary thru end of FY03.
- Central Region and Western Region has GIO Office personnel --
Eastern Region has no GIO Office personnel yet, but a vacancy
will be advertised soon.
- NWIS -- Alan Lumb retired and advertised Chief's vacancy --
Isabelle is Acting Chief, NWIS and Mindy Lanza is Acting Chief,
BAMS. The AIS staff will be transferred to NWIS and DIS.
- Party line is that Basis will be ready in FY03 and AIS will be
abandoned.
- TNA will not be ready until January, so AIS will need to continue
until then.
- Alice Sabatini and Steve Blanchard will draft a letter to the
Districts regarding the status of AIS and Basis. They will get
this letter reviewed by the Bureau. Isabelle indicates that a bare
minimum maintenance for AIS would be $200K.
- GIPO is scheduled to move to GIO by October at the latest.
- WRD will not fund these personnel in FY03. Plans are that
OIH will transfer to Bureau.
- Handout for GIO Organization.
- 65 personnel transferred from OIS to GIO last week.
- GIO Leadership Team is matrixed from disciplines, regional
points of contact, HR, APS, Budget, and OC
- Information Security Team Leader is Don Watson.
- Chief Technology Officer position is advertised and most
qualified list has reached the GIO.
- Jim Brokaw is Acting Chief Technology Officer.
- Senior Advisor for Information Policy and Services is
Hedy Rossmeissl
- Chief Scientist for Information is Anne Frondorf
- Federal Geographic Data Coordinator Director is
John Moeller group.
- Telecommunications Infrastructure Team Leader is
Elaine Stout.
- Knowledge Management Infrastructure Team Leader is
Paul Celluzzi.
- Acting Computing Infrastructure is Mark Kutsko.
- Organization charts (handouts) show that the regional
GIOs are matrixed to GIO.
- ISSUES RAISED:
- Jessie Alvarez raises concern regarding issues of how have
NT TAC and SUN TAC to work with GIO groups.
- Isabelle Halley suggests that WRD advisory groups, such as
these become advisory groups for entire Bureau This is a
potential letter to GIO.
- WAN is now a Bureau activity. Service Level Agreements
exist between WRD and the Bureau.
- Security Breach a few weeks ago may have a silver lining.
- In 2001, Congress passed the Data Quality Act effective
October 1, 2002. OMB and DOI and each Agency needs to
detail what is meant by Data Quality. A GIO Team is
being put together. Steve Blanchard has information.
- Other OI topics will be presented during this meeting.
See agenda.
- NWIS COTS: Hydrotasmania is a company that has an
ADAPS. Steve Blanchard is investigating a CRADA between
this company and USGS. USGS will be provided the source
code.
- Fair Act (FY03):
- Publications Area affects information significantly. Scoping teams
will include Greg Allord and one or two field personnel. The teams
will determine what functions will be affected and the scope and
contracting vehicle to be used.
- FAR procurement rules will be used because A-76 is going away.
- Budget (WOTSC):
- Indications are that all proposed cuts will be restored -
maybe even a few increases.
- Look for cooperative programs increases in FY04.
- Loss of WOTSC will affect program.
- Fund NWIS a $10 Million in FY04. Must go thru DOI and OMB.
- Only cost center assessment and Bureau (11 percent Gross;
9.9 NET) will be the only assessments.
- For FY03:
- 5 Regional Office reduction
- 10 Technical Office reduction
- 20% Office of Information (2 Million decrease)
- 1.3 assessment to Water offices to fund QA processes.
|
9:30 AM |
BREAK |
|
TOWN MEETING |
10:00 AM |
Pete de Vries presented an overview of the New York District computer activities.
{power point presentation goes here} Some comments follow:
- Pete pointed out that the NWISWeb page shows no gages for Long Island
when there actually are. Also, there are real-time tide gages.
(First question is "What's near me?")
-- Comments / clarification from Chris Ryan,
New York District, 5/28/02 --- Answer from NWISWeb team:
"I spoke with Pete deVries regarding his question on sites showing
up on the map which is displayed on NWISWeb. He had expressed concern
on the fact that there are sites that do not appear on the map although
they have real-time data available. He clarified that what he was
communicating was the need for a map that has ALL real-time sites
available as well as the current map which displays only Streamflow sites.
Further, he expressed the need for a map that would fit to all of the
predefined real-time displays including ground water. This is something
to add to the enhancements list and will need to include discussion with
the Water Watch team". --Chris Ryan, 5/28/02.
PC- Anywhere can be configured for encrypytion.
There is approximately a 4-year replacement cycle for desktops
and windows servers.
Grady presented an overview of the New York District Program.
{power point presentation goes here}
Todd Siskin has a write up of the New York District Real-Time Kiosk
software. Todd's Kiosk document
-- Loren Kloft mentioned that he uses a software package called
Site Kiosk, cost is $150.
New Technology: Underwater Modem measuring tidal flow in the
Hudson River.
|
11:00 AM |
District Employees Town Meeting Discussion: Brief Presentation by the Chiefs of:
- Gary Neverdon presented the DIS Program
Office Update
- Isabelle Halley gave a briefing on NWIS Status:
- NWIS Status
- NWIS 4_2 Schedule
- NWIS 4_2 Summary
- NWIS 4_2 ADAPS
- NWIS 4_2 GWSI
- NWIS 4_2 QWDATA
- NWIS 4_2 General
- Isabelle Halley gave a Update on AIS Status -- as of today AIS is going away
October 1, 2002.
- Issues:
- Bureau TNA will not be available before January 2003,
therefore WRD will have to maintain a skeleton AIS
until the bureau TNA is available
- There is no guarantee that APS will continue to provide
the FFS and FPPS interface data that is dowloaded into
AIS (daily, weekly, monthly), making AIS useless as a
budget execution tool
- There is no WOSTC in FY03 - How will we fund the
minimum AIS support estimated to be under $200K?
- BASIS has no plan at this time to accept AIS historical
data (there is possible hope
as of late Thursday, May 16) --
Reference
attached emails.
|
11:30 AM |
The ITAC members and the District Employees wrapped up the Town Meeting with the
follwoing Questions and Answers Session:
- Blanchard: Is S-Plus training provided at the District Offices?
--Neverdon: Yes.
- Kloft: Are there any extra telecommunications costs to Districts
this year due to the switch to MCI?
--Neverdon: No.
- Siskin: Has anything been done to get additional telecommunications
gateways?
-- Under discussion - Elaine Stout is looking into this.
-- Neverdon: Some WRD offices are converting to private ISP
networks.
- What is the expected down time for transfer to NWIS 4_2?
-- Halley: Between one (Georgia) to four (California) days.
The NWIS development team is working very hard to reduce the transfer time.
Following last week (May 20-24 transfer meeting), the transfer time
had been reduced by ¼th.
- Would it be advantageous to off-load unit values to improve transfer time?
-- Halley: Don't know - will ask NWIS.
-- Districts will want to make sure there is plenty of disk space.
-- Colleen Babcock will send out a memo next week with some examples
of space requirements.
-- Comments / clarification from Colleen Babcock:
My recommendation would be NOT to off load unit values, but the
procedures are available to do this. In fact we have had recommendation
that the archived unit values data be loaded back into the database prior
to the 4.2 transfer.
- Siskin: What kind of errors occurred during transfer?
-- Halley: Ingres errors, space problems, and transfer
program errors
-- Comments / clarification from Colleen Babcock:
Additionally there may be data problems that are identified, in which
case the "bad" data will be written to ascii files for further review by the
district.
- Siskin: Does UV split function in NWIS 4_1? Apparently NY tried
(perhaps at 3.2) and it did not work.
-- Halley: Don't know - will find out.
-- Comments / clarification from Colleen Babcock:
I am not aware of any problems with the UV split program at 4.1 and
the program, we will follow up with Todd directly.
- Siskin: Is the Denver training user training?
-- Johnson: Yes, a train - the -trainer. The class
announcement.
- Is there going to be a Data Base Administrator's Course?
-- Yes, next year. -- There is a need for both a System DBA
course (ingres, sql, maintenance) and those "dba" duties such as site
creation, DD creation, real-time system maintenance etc. It was recommended
that in addition to the pre-transfer cyber seminars and the two user
trainings, there should be a few cyber-sems for the ADAPS management topics
(perhaps also QW and GWSI):
-- Add new users.
-- Data Base Access issues
-- Build new data base
-- PLOTWAT Issues - Cooperator Access is CHANGED (Scott B. knows
this) etc.
-- Comments / clarification from Colleen Babcock:
These are very good suggestions and we'll try and work them into the
schedule. It will be much easier to address short topics via cyber seminars
that try and develop and coordinate the entire DBA class. If there is
enough interest in an Ingres DBA class, I'm sure we can get Greg Shank to
conduct one.
- Siskin: Will the DBA documentation be available at the time of the
release? I understood this was about general documentation not dba specific
documentation.
-- Johnson: Yes, the DBA documentation is being
rewritten.
-- Comments / clarification from Colleen Babcock:
The ADAPS user documentation and the ADAPS administrator documentation
are both being re-written, we also are updating the General DBA documentation
as time permits. We will make every attempt to update the
/conversion/nwisdocs3_2/nwis_db.maint.html
document for 4.2
- Jessie: Will this include the NWIS data structure?
-- Halley: NWIS DB
- Tom Suro: Have a lot of users who use ADAPS on a day-to-day
basis involved in ADAPS 4_2?
-- Johnson: Yes.
-- Comments / clarification from Colleen Babcock:
Yes, I would.
- Tom Suro: Will users start working records with 4_1 and then switch
to 4_2?
-- Johnson: Yes.
-- Comments / clarification from Colleen Babcock:
I would yes.
- Suro: Will NWIS 4_2 allow input of discharge from other software
programs other than ADAPS?
-- Johnson: Yes, you can load B cards and 2 and 3 cards.
- McCallum Comment: With NWIS 4_1, it takes more steps to retrieve
water-quality data?
-- Comments / clarification from Colleen Babcock:
There are additional steps to accommodate the additional data types
that are available with the 4.1 release. I'll have Dorrie follow up with
Brian.
- Pat Murray: Are all annual data reports being rewritten for NWIS
4_2
-- Blanchard: Yes, Ed Fischer in Iowa, is working on this.
- Suro: Is NWIS 4_2 slower?
-- Johnson: Data retrieval is slower.
-- Comments / clarification from Colleen Babcock:
Joel is correct we have taken a performance hit on some programs that
may not be corrected before 4.2 is released.
Suggest using WATMOVE right before the transfer. WATMOVE will be
ready by the time all districts have completed transfers.
Pat Murray: Will graphics stay with tkg2?
-- Halley: Yes, and tkg2 will be around for the near
future.
How much is being done to switch to ORACLE?
-- Halley: Steve Brady is doing an evaluation on the
implication of the port of NWIS to Oracle.
McCallum Comment: OUTWAT and rounding issues are significant.
-- Johnson: Don't use OUTWAT, use NWIS2RDb. OUTWAT is
PRIME code.
Kloft: Now that NWIS 4_2 is completed? What about sediment
processing.
-- Blanchard: No concrete plans for any functions after NWIS
4_2.
Kloft: Will discipline database in Bureau stay with the discipline
offices.
-- Blanchard: There is no plan to move discipline data
bases to the GIO.
Pat Murray: Has anything changed with the Peak Flow file?
-- Johnson: The database has been attributed, but nothing
with the application.
Isabelle: Will come up with answers to several questions and
issues by asking the NWIS staff for answers.
- UVSPLIT
- archive and restore Unit Values
- Should there be an NWIS DBA course?
AIS/Basis in FY03:
- Comment Halley: A skeleton AIS must be maintained to handled
the TNA.
- Comment: BASIS is Web-Based and will include budget and
project information system. Limited reports will be available.
- Assignment of UNIX Numbers will be done through Lotus.
- Kloft: Daphne Chinn indicated that there will new user ids?
Reference: NEW UPDATE to NAB--Employee id
-- Halley: Will need to look into this.
|
Noon |
LUNCH |
1:00 PM |
ITAC Discussion of the District Issues from the Town Meeting (ITAC members)
- Nelson Williams indicated that there was not enough time for general
computer questions. Jessie Alvarez indicated that there needs to be more
interaction with the District staff. Some personnel were not in the
meeting today and Grady will schedule time later for ITAC to meet with
them. Isabelle suggests sending AIS, NWIS and DIS the powerpoint
presentations ahead of time. Steve Blanchard suggested sending out a
request for District questions ahead of time.
- The plan is to adopt a shorter time for town meeting presentations, say
three topics and 5 minutes each and have a few questions to start from
the District.
|
1:30 PM |
Isabelle Halley gave brief status and update on
AIS and BASIS+/AIS migration.
- NO WOTSC -- How can we pay for AIS? $200K would be needed just for
maintenance.
- AIS has interfaces to FFS and FPPS; these interfaces could be turned off
any time after October 1.
- A skeleton AIS staff is needed until January 1, 2003 to provide the TNA
functionality.
Leo House was on the conference phone and indicated that the
information is not getting to the District Administrative Officers.
The Administrative Officers have concerns and wonder if they need
to download data to spreadsheets.
--Isabelle: We cannot send a memo to the District unless we
have authorization from the Director, Carole Aten, to keep AIS running in
FY03 and the funding of AIS is resolved.
- BASIS may have no way to track costs in the first release and compare
these costs to funding in a single report.
- The WRD users will have to use FFS reports from the ORACLE data
warehouse.
- House: Can the budget formulation information from AIS be
accessible?
-- Isabelle: Yes, you may maintain your AIS database and
enter budgets but daily expenditures, labor costs, and personnel
information, may not be available. If labor costs is not available,
the re-computation of employees hourly rates on a bi-weekly basis
cannot be performed.
- House: Should NRP set up excel spreadsheets to track daily
labor costs?
-- Isabelle: Don't know. Cheryl Music, New York
Administrative Officer indicates that FY03 project budget information
will need to be entered manually rather than exported from AIS and
imported into BASIS.
- Williamson: Does BASIS have a user group that has WRD
representative?
-- Isabelle: New York is a test District just for the
MIS part of BASIS. This data must be entered into BASIS by then end
of June. Training for BASIS is in Reston; Leo House suggests that
training be held at the Regional offices (this should be included
in the letter to the GIO/Bureau.)
May2002.NY.1 - ACTION ITEM --- Isabelle will send Leo
House instructions for AIS "cut and paste" to BASIS for MIS.
--- Completed, with
5/14/02
email.
- Demise of AIS
|
1:45 PM |
Short followup on ADS and communications with GIO LT by Steve Blanchard and
Gary Neverdon
- No response to the ITAC January memo has been received from the GIO office.
The Lighthouse group is in the process of updating the ADS report. Jessie
Alvarez indicates that the Districts need guidelines for implementing ADS.
A decision needs to be decided if there is going to be a Bureau ADS domain.
All District and all Disciplines except NMD (and Donna Sholz) were against
implementing a Bureau level ADS. Steve Blanchard will tell GIO LT that
ITAC will recommend a cost center implementation of ADS. The NT TAC is
working on ADS documentation for WRD cost centers. ADS Benefits and
Technical Issues were presented to Eastern Region Director and the Regional
Executives by Nelson Williams.
|
2:15 PM |
(All Members) ITEM Status |
2:30 PM |
Katherine Lins gave a briefing on the progress of the
"Information Strategy Team"
|
2:45 PM |
BREAK |
3:00 PM |
Jessica Alvarez & Sandy Williamson provided information update on the
"USGS Information Architecture"
Related Documentation:
- Emails on Subject:
Architecture Tiger Team
Briefing
- Architecture Statement of Work
(revised extensively by the Tiger Team, most current copy 4/10/02)
- Briefing document
(pdf), Karen Siderelis and Hedy Rossmeisel
- Architecture
steering committee charter (current version)
Impact of Information Architecture Committee and Feedback:
Office of Information Issues and Feedback:
- * Recommend improved communication with GIO Office and Groups
(e.g., Security Chain of Command)
- VBNS Upgrade does not support redundancy of WRD Network
- Action Need
- Telecommunications Cost - Determine Pros and Cons of offices going
with their own ISP
- * Slowness of water.usgs.gov
- DIS Support suggestions solicited from ITAC
- Basis Plus - Concerned about single point of failure
- NWIS Historic Data rounding issues
- Update on NWIS Graphics
- Centralization of (Information) activities in Bureau
- Committees' Representation -- Advocacy
- Competitive Sourcing with respect to computer personnel
- Cyber Seminar Quality
- Training Management System
- Suggest new name for District Chief; such as New York Director for
Water Programs
- Annual ITAC Report and ITAC Communication
|
3:30 PM |
GIS Tiger Team progress was presented by Bob Pierce.
|
4:00 PM |
Gary Neverdon presented information on the
"Tiger Team Help Desk" |
4:30 PM |
Jessica Alvarez presented a Demonstration of
Maryland District "Dial-up" Data Logger Sites |
5:00 PM |
Sandy Williamson gave a MapInfo tour |
After tour |
ITAC ADJOURN for the day |
Wednesday, May 15, 2002 |
Time |
Agenda Item |
8:00 AM |
Steve Blanchard presented an update / sharing information on the NWIS
Executive Steering Committee.
Followed by the following discussion and comments:
- National Water Quality Meeting next week in Wisconsin?
- Sandy Williamson: Who is the best person to answer questions about STORET?
-- Steve Blanchard: Dorrie Gellenbeck and Terry Schertz can answer
questions.
Steve will provide a write-up of the STORET issues to Sandy Williamson.
- Isabelle Halley: indicated that Oracle is more vendor centric than other
RDBMS vendors.
- Isabelle Halley: indicated that there are NWIS proof of concept tests
ongoing, such as with Steve Brady in Kansas.
- Steve Blanchard: indicated that NatWeb would be up and functional by
end of FY03. This would take the load off of the District servers.
- Jessica Alvarez: Why isn't NWISWeb running on NatWeb?
-- Isabelle Halley: The NWISWeb software (production of the NWIS data)
is not available now on NatWeb; only the web pages are available on NatWeb.
- Jessica Alvarez: Will NWIS ever be a centralized system?
-- Steve Blanchard: This is the AMS recommendation (and other
businesses are centralized); but no decision has been made. Districts want to
have control of the data. There was a lively discussion and debate of NWIS
-- centralized vs. decentralized.
- Sandy Williamson: A feedback mechanism, such as a flag needs to be set
in NWIS site header table by NWIS View to indicate the data quality of the
site location data. Then Districts can chip away at improving the site
location data.
- Brian McCallum: NWISWeb Slide - note that the NWIS Web User Group was
dissolved.
- Isabelle Halley: Susan Trapanese had no staff to analyze and prioritize
external user requirements.
- Steve Blanchard: Bob Reynolds has been assigned half time to assist
Susan.
- Mark Nilles: Who dissolved the NWISWeb user group?
Steve Blanchard: There was only one meeting. Actually, the
surface-water web user group was dissolved; Brian McCallum was the
surface-water web user group Chair.
|
9:00 AM |
Isabelle Halley gave a NWIS Status Report
|
10:00 AM |
BREAK |
10:15 AM |
Brian McCallum gave a Demo of the Georgia District CD-ROM Annual Data Report
Steve Blanchard suggested reading
Policy for
the Release of the Annual State Water Data Reports -- WRD MEMO DISCIPLINE
POLICY #2002.02 dated October 22, 2001. |
11:00 AM |
Charlie Merk presented a briefing on the
Status
of Handheld Computer Activities |
Noon |
LUNCH |
1:00 PM |
Lorna Schmid (remotely) presented the
Status of NatWeb |
1:30 PM |
(ITAC Members) Approving ITAC Goals for FY02
- ITAC Progress Report for FY02 should include:
- Establish NWIS ESC
- ADS Letter to GIO
|
2:00 PM |
ITAC Members participated in a discussion of ITAC funding priorities:
|
3:00 PM |
BREAK |
3:15 PM |
Brian McCallum, lead the discussion of the "Future Role of ITAC" and the
ITAC Charter with all present ITAC
members. There were two basic options facing the group:
- Take a stand, stick it out !
- Pick two or three major topics and fight for them.
- Last morning before we adjourn, put together letters and finish
them before we leave the ITAC meeting. Action items should be
focused on gathering data for future letters.
- GOALS OF ITAC
- Ensure that the interests of the customers of the Water
Program are represented and served during Bureau's
evolution.
- AIS/Basis Plus
- Loss of core IT support
- Improved Communications
- Continue to monitor, recommend policy direction, and
provide field-level communication of the status of for
major Water Program software packages.
- NWIS
- NWISWeb
- Modeling software
- GIS
- Continue to monitor and develop policy for general computer
usage for the Water Program.
- Network
- Office computers
- Field computers, PDA's, etc
- Next Step
- Divide into groups to write letter/reports
- AIS/Basis Plus - Send to Carol Aten thru Regional
Executives
- Loss of core IT support - Send to Karen Siderelis
- ITAC report
- Progress in last year
- Goals of next year
- Letters should describe issues/problem and offer possible
solutions and be positive about Bureau Reorganization
Pack up the laptops and go home !
May2002.NY.2 - ACTION ITEM --- Steve Blanchard will
wordsmith the Parts, such as Part B, of the
ITAC charter based
reflecting the organizational changes in the Bureau. Reflect
change that ITAC reports to both the Associate Director for Water
and the GIO. Revise and report at the next meeting.
May2002.NY.10 - ACTION ITEM --- The ITAC Chair will
officially send out ITAC minutes to the Regional Executives,
including the Regional GIO and to the Associate Director for
Water.
May2002.NY.11 - ACTION ITEM --- ITAC members shall
send out the minutes to all the Lotus email abbreviations of the
constituents they represent and follow-up with how the minutes
effect the constituency.
Discussion on the "Role of ITAC":
- Mark Nilles made a motion is to disband the ITAC.
- Sandy Williamson seconded the motion.
- Alvarez suggests that disbanding is an abandonment of the WRD Districts.
- Sonja Jones indicated that her District is paying for her attendance and
expects productive ITAC meetings.
- Nelson Williams indicated that ITAC, in the last two years, has completed
many short and long term goals and action items.
- Steve Blanchard summed it up that there is a need for ITAC to communicate
with the reorganized Bureau units - additional communications is need with
the Regional Executive Staffs, who are in control of the Districts.
Unanimously, the ITAC voted not to disband.
- An ITAC decision was made to keep the same ITAC meeting schedule at three
times a year and add a monthly (conference call) meeting on the 3rd Friday
of the month at 11:00 AM Eastern Time. The first conference call meeting is
June 21.
|
4:15 PM |
(ITAC Members) Future Role of the Office of Information (OI)
- A discussion where $2M can be cut from Office of Information
- ITAC agrees that NWIS is the top priority.
|
5:00 PM |
ADJOURN |
Thursday, May 16, 2002 |
Time |
Agenda Item / Notes |
|
Steve Blanchard announced that Tom Wood has been selected the permanent Chief
Distributed Information. |
8:00 AM |
Gary Neverdon presented information on the GIO's IT
"Help Desk Tiger Team"
Alvarez: Where does the WRD Distributed Information System Program Office
fit in? (refer to Preliminary Org Chart)
Neverdon: USGS Information Tecchnology Expert Pool
There was a discussion of the duplication of effort that is implied in the
preliminary organization chart for the three regional help desks.
ITAC Members are encouraged to write to Tom Wood with comments and concerns
about the Preliminary (help desk) Organization Charts.
ITAC Letters -- Several letters to Bureau Management expressing concerns
of ITAC members were drafted and discussed during this meeting.
- "Draining of the Office of Information Resources"
{ final of ITAC (Nelson Williams' letter goes
here }
May2002.NY.3 - ACTION ITEM --- ITAC members will send
"Draining of Office of Information Resources" draft letter review
comments to Nelson Williams by COB May 24; Loren Kloft will send
the letter to Steve Blanchard by Tuesday morning May 28.
- "Basis AIS Conversion"
{ final of ITAC (Grady Moore's)
letter goes here }
May2002.NY.4 - ACTION ITEM --- ITAC members will send
"BASIS AIS Conversion" draft letter review comments to Grady Moore by
COB May 17 ; Grady Moore will send the letter to Steve Blanchard by
Monday morning, May 20.
- "Communications"
{ final of ITAC (Jessie Alvarez's)
letter goes here }
May2002.NY.5 - ACTION ITEM --- ITAC members will send
"Communications" draft letter review comments to Jessie Alvarez by COB
May 24 ; Jessie will send to Steve Blanchard by Tuesday morning May 28.
- "SLEDS" (final of ITAC
{ final of ITAC (Loren Kloft's) letter goes
here }
May2002.NY.6 - ACTION ITEM --- ITAC members will send
"SLEDS" draft letter review comments to Loren Kloft by COB May 24;
Loren Kloft will send the letter to Steve Blanchard by Tuesday morning
May 28.
|
8:30 AM |
(Sandy Williamson) Overview of Quick Place |
9:00 AM |
Greg Allord shared information on:
|
10:00 AM |
BREAK |
10:15 AM |
OPEN |
11:00 AM |
(Brian McCallum) ITAC Meeting wrap-up:
- Review & Validate action items from this ITAC meeting
-
May2002.NY.7 - ACTION ITEM --- Steve Blanchard will
followup with the WRD Senior Staff on rotation ITAC member
assignments: Pat Vallance, Loren Kloft and Mike Slifer.
-
May2002.NY.8 - ACTION ITEM --- Charlie Merk will
summarize the goals that have been accomplished since January 2001
and send to ITAC members.
-
May2002.NY.9 - ACTION ITEM --- Brian McCallum will
followup with the Southeastern Regional Hydrologist to determine
the location of the next meeting.
- Determine Date & Location of next ITAC meeting
- Suggested Locations:
- Atlanta, Georgia District Office
- San Juan, Puerto Rico
- Tampa Subdistrict Office
- Montgomery, Alabama
- Dates: September 10 - 12, 2002
- Conference Phone Calls: June - July ITAC Conference Call
Agenda Item - 3rd Friday 11 AM Eastern Time
- Draft the Agenda for next meeting
- Letters Status
- AIS
- Communications
- Review of past goals
- Annual Report
- Progress
- Upcoming goals
|
11:30 AM |