USGS - science for a changing world

National Water-Quality Assessment (NAWQA) Program

 Go to:      NAWQA Intranet     NAWQA Public     Water Intranet     Water Public     USGS Intranet

NAWQA Intranet

For internal use only
Guidance for: FY17 FY16 FY15 FY14 FY13 FY12 FY11 Archived WPG | Misc Guid Memos | Data Arch
Intranet Resources
National Synthesis
Regional Synthesis
Topical Teams
Trends
Water
Data
Work Plan Guidance
Internet Resources
Trends
Water

Work Plan Guidance

FY 2002 Work Plan Guidance for NAWQA for 91, 94, 97 and 01 Study Units (SUs)

FY02 Guidance Memo for all SUs

FY02 Sampling Guidance

FY02.CycleII.SW.Guidance outlines the general guidance for surface water (chemical and biological) sites and contains a link to the surface water design documentation for Cycle II Surface Water Trends and Status Assessment - revised 5/18/01, 6/21/01, 6/26/01, 9/17/01, 10/17/01, 10/25/01, 11/26/01, 2/01/02, 2/05/02, 2/14/02. This link contains specific information on the type of sampling (agricultural, integrator, etc.) and supporting information such items as analytical costs, sampling frequency, and analytical schedule number.

The FY02.SWPLAN is different from previous years surface water planning database in that it combines both the HIP and Trend/LIP information; divides the required site information into cycle level (static over 10 years) and annual level (updated each sampling year); and requests sampling information for all required and optional analytes and respective QC's. The "general_instructions" worksheet indicates the worksheet(s) that need to be completed by each group of study units as part of the FY02 work plan.

FY02.CycleII.GW.Guidance outlines the general guidance for ground water networks and contains a link to the ground water design documentation for Cycle II Ground Water Trends and Status Assessment - revised 6/21/01, 6/29/01, 7/16/01, 10/17/01, 10/24/01, 2/01/02. This link contains specific information on both resampled and new status assessment networks and supporting information such items as analytical costs, sampling frequency, and analytical schedule number.

The FY02.GWPLAN (11/06/01) contains worksheets for both Cycle II GWPLAN and Cycle I GWPLAN. The Cycle II GWPLAN has been updated to reflect the changes in the GW Trends and Status Assessment. Specifically, new rows have been added to the Cycle II GWPLAN to correlate with the basic quality control requirements identified to date.

The FY02.GWTRENDS (11/06/01) contains information on all the Trend networks to date. The FY02.GWTRENDS has been updated to reflect the changes in the GW Trends and Status Assessment. Specifically, new columns have been added to the GWTRENDS to correlate with the basic quality control requirements identified to date.

Also, the SWPLAN, GWPLAN, and GWTRENDS files each contain a definitions worksheet that should be used when entering the requested information.

SU Personnel Staffing

All SUs should complete the SU.PersonnelStaffing spreadsheet.

Budget Template

SU.BudgetTemplate spreadsheet includes the worksheets: Expenditure FY01 and Budget FY02. - Revised 5/3/01, 6/20/01, 10/25/01

Publications Status

All SUs should complete the SU.PUBS.Update.

Specific Information Requests for FY02

Status and Timelines for New Cycle II Teams

Conference Calls

Work Plan distribution: GS-W NAWQA NLT, GS-W NAWQA NST, mkoterba, rmusson, wlapham, capel, mdmunn, wbbryant, stark, and rdeweese

Action Item Template for conference calls - revised 6/21/01.

After the work plan has been distributed, please contact Rosemary Musson (703.648.5702, rmusson) to confirm your scheduled conference call. The ConferenceCalls spreadsheet contains the current schedule.

Update Log for Work Plan Homepage

An Update Log for all changes on this page will be maintained by Rosemary Musson. Please be sure to notify Rosemary when updates are made or needed. She will coordinate the change with Kerie Hitt. When an update is made to the above information a "New" will be posted by the topic for one month. The user can then go to this Update Log and look under the topic to see the date of the update and the specific update or the location of the update. Example: Budget Template, changed 7/6/01, new overhead rate is 3 percent, see row 5 column 6 on spreadsheet. Because "Conference Calls" frequently changes it will not be a part of this log.

Accessibility FOIA Privacy Policies and Notices

Take Pride in America logo USA.gov logo U.S. Department of the Interior | U.S. Geological Survey
[an error occurred while processing this directive] URL: http://water.usgs.gov
Page Contact Information: Carise Barbour
Page Last Modified: Tuesday, 20-Oct-2009 16:04:45 EDT