Water Resources Research Act Program

Details for Project ID 2006GU75B

Development of an optimum Operational Management for the Saipan Water Distribution System

Institute: Guam
Year Established: 2006 Start Date: 2006-03-01 End Date: 2007-02-28
Total Federal Funds: $52,446 Total Non-Federal Funds: Not available

Principal Investigators: Shahram Khosrowpanah, Leroy Heitz

Abstract: The Government of the Commonwealth Northern Marianas Islands (CNMI), has invested a large amount of funds to improve the Saipan water distribution system, but delivery problems still exists. A stated goal of the CNMI government is to provide 24-hour water to all residents served by the Commonwealth Utility Corporation (CUC) water system. This goal will be unattainable until the CUC has a complete knowledge of their water delivery capabilities and operation. Over the years the CUC water distribution system has grown and new wells have been added to the system. This physical expansion has been well documented but improvements in the hydraulic characteristics and delivery capabilities of the entire system have never been fully examined. The Saipan water distribution system has been divided into 10 sub-regions. Each region is expected to operate somewhat independently. However, due to inadequate inflow to the system, system leakage, and lack of knowledge of the system behavior as a whole the system is unable to provide 24-hour water services. WERI researchers have developed computerized models of each of the ten sub-regions of the CUC water system using the Haestad WaterCad water system modeling program. They also, developed a Source, Transmission and Storage model of the Saipan Water System. This includes a Skelaton of the existing 10-region water system models that are joined together at the boundary points. The next step needed is to examine various system operational schemes in order to find an optimum way to transfer water from sources to the customers. The benefits expected from the project include a better understanding of the adequacy of the existing pumps and well systems, the adequacy of the existing storage facilities to provide for daily fluctuating demands, the ability of the well and storage system to provide sufficient flows, and a more in depth understanding of the most efficient means to move water from water supply rich regions to those that have supply shortages in order to maintain delivery of 24 hour water to all areas in the system. The project will be split into two phases. The first phase will be to finalize the skeleton of each Saipans sub-water system. We will work closely with CUC Engineering staff to be sure all included components such as pipes, tanks, wells, and reservoirs are correctly modeled and they match with field data. The second phase will determine the optimum system operation. This phase will be accomplished in close consultation with CUC staff engineers. First the model will be operated in steady state mode and the response of the system during critical times will be examined to determine if the system can meet the required demands and if not what changes in either operation or physical make up of the system would be required to solve the problems. Next the model would be operated in extended time simulation mode to examine storage tank operations. The response of the storage tanks during these critical times will be examined to determine if all of the tanks are operating in an optimal manner and if not what changes in either operation or physical make up of the system would be required to improve tank operations.