AI Identifier |
Person(s) Assigned /
Description of Action Item / Status of AI/Comment |
NOV2000.HA.1
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Mark Nilles & Bill Carswell
Description of Action Item: Mark will check on the status of why SLEDS could not be
installed successfully in the Hawaii District. Mark will report back to Bill Carswell on what he
can find out about the overall SLEDS status and plans from the Office of Surface Water. Bill will
bring the issue forward to the Senior Staff.
Status/Comments: 1/29/2001 -- Bill Carswell talked with Mike Norris last week
regarding SLEDS. He agreed to have a meeting of the SLEDS programmer from CVO and the Kentucky and
Iowa Districts in an attempt to get functionality issues resolved. Bill Carswell gave Mike Norris
a copy of the SLEDS questionnaire results furnished by Loren Kloft and a copy of the John Grey email
forwarded to me by Scott McEwen.
Loren will get back to Bill Carswell in a couple of weeks on whether or not such a meeting has
taken place or is planned.
See Scott's writeup attached:
SLEDS, 1/18/01; also
reference the Sediment Lab Chiefs' replies compiled from the July 2000
SLED's survey
distributed by John Gray (OSW).
|
NOV2000.HA.2
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Mark Nilles & Bill Carswell
Description of Action Item: Action Item NOV2000.HA.2 combined with Action Item
NOV2000.HA.1 above (January 31, 2001).
Status/Comments: Reference
writeup from Loren Kloft,
11/13/2000
|
NOV2000.HA.3
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Greg Allord & Bob Pierce
Description of Action Item: Greg and Bob will address the status and plans for
Hydrologic Unit Code (HUC) for Hawaii. Discuss resolution needed with NRCS.
Status/Comments:
|
NOV2000.HA.4
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Tom Wood
Description of Action Item: Steve Hammond & Tom will discuss the status and plans
for connectivity to the Outer Islands.
Status/Comments: Update from Tom Wood, 1/26/01 - Tom discussed the status and
plans for improved connectivity to the outer islands with Bob Wakelee. Bob said the USGS network folks are
looking into this but the cost could be prohibitive for such small offices. Bob discussed this with Carol
Lawson in Menlo Park. Carol said she will be attending the annual Hawaii Intranet Consortium meeting to
renew USGS agreement with DOD. This meeting with be held at the same time the Asia-Pacific network meeting
occurs. Therefore, there should be network personnel representing various groups from Guam and the
Marianas. Carol will see if she can establish contact with these folks and raise the issue. Carol will
let Bob know what is discussed and if any new options can be initiated.
Update from Carol Lawson, 3/28/2001: Gordon -- Since I last wrote, two more carriers have added
higher speed access (or are about to). In addition to the DSL service available from Startec, Guam net is
offering broadband (cable) service. ITE (Talaya) has announced that DSL will be available from them in
April. Based on the rapid changes, would you like to wait a little longer and see what plays out, or try
ordering service with one of the carriers now? Please advise. Thanks. -Carol
3/28/2001 - Just going back through the other recent notes on this-- the pricing looked pretty good--
I can't see how you would get much better than that pricing (unless those are teaser rates...-- that is,
quotes for lowest speeds since DSL is distance dependent). Anyway, my gut is that if they get DSL at a
reasonable rate NOW, they should start seriously looking into it, perhaps even try it out. At those
prices, it's hardly going to break anybody just to try it. My feeling on waiting is that there may be
lots of delays waiting for the others to ramp up. -Bob Waklee
3/28/2001 - Hi All, The prices that Carol has provided in earlier emails is this the cost per month,
for either 6 month term or a 1 year term. So if we tried DSL for 6 months, is the cost at $ 140.00 a
month or $ 140.00 for 6 months. Carol, the other carriers that have added higher speed access are their
rates about the same as Startec? - Leo
3/28/2001 - Leonora, Off the top of my head, I'd say it's $140 per month. I haven't obtained pricing
from the others, because I wasn't sure of your interest. Personally, I'd get information from all
carriers and prepare a comparison table (for availability, functionality, and cost). I'll be telecommuting
tomorrow and will be out of the office on Friday. I'll be in Reston all of next week, and will have little
time to read email (because I have evening meetings with other agency personnel, and all day meetings at
the Survey). If you wish, I can resume efforts when I return on April 9th. -Carol
|
NOV2000.HA.5
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Alan & Greg
Description of Action Item: Alan and Greg will get together and compile the graphics
question for the next agenda. They will confer with the District employees to find out what the issue
is? What has been done? What hasn't been done? and When?
Status/Comments:
|
NOV2000.HA.6
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Tom Wood
Description of Action Item: Tom will send out to the Districts information on the
product's (NORTON Ghost Imaging Solution package) overview and will solicit any interest from
anyone who wishes to be part of a centralized purchase.
Status/Comments: Update from Tom Wood, 1/29/01 - There has been little activity
on this action lately. I've requested that NT TAC provide me with the information needed to send out
the note to the field. Target date for the note is Feb.
|
NOV2000.HA.7
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Steve Hammond
Description of Action Item: Steve will see to it that the Office of Information
would buy a Fortran Lahey compiler for Dan Winkless, because Dan supports the Fortran help
function.
Status/Comments: COMPLETED -- Joyce Solomon
of DIS placed the order for this software on her credit card on 11/15, using the DIS
account (total $808). Vendor was directed to ship the software directly to Dan Winkless.
per email message from Tom Wood, 12/05/00 08:08 AM
|
NOV2000.HA.8
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Mark Nilles
Description of Action Item: Mark will get a timeline for the discipline office
archival group's deliverable.
Status/Comments:
|
NOV2000.HA.9
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Mark Niles, Sandy Williamson, and
Scott McFarlane
Description of Action Item: Mark (discipline offices), Sandy (comments from
Biology/NAWQA), and Scott (NRP) will collect the review comments for the archival instructions.
NAWQA personnel needs to know 1) what NAWQA needs to archive and 2) what is already taken care of.
Status/Comments:
|
NOV2000.HA.10
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Loren Kloft
Description of Action Item: Loren's next step is to ensure that Section Chiefs,
Site Administrators, Regional Hydro Technicians Committees, and Ernie Dreyer review for comments
and suggest more details in Loren's CPAC archival document. Loren will compile the comments and
hold off on updating the necessary pages that would complete the CPAC archival document.
Status/Comments:
|
NOV2000.HA.11
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Mark Nilles
Description of Action Item: Mark is to update the District NWIS DBM position
document and hand the document over to NWIS, who will own this document.
Status/Comments: COMPLETED --
Reference finalized NWIS DBM
position document that has been revised to incorporate Discipline office comments
|
NOV2000.HA.12
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Alan Lumb
Description of Action Item: Alan will send out an email to all Senior managers
distributions A, B, C, D, DC, CD, etc. to announce the availability of this document.
Status/Comments:
|
NOV2000.HA.13
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Greg Allord, Sandy Williamson, &
Carl Goodwin
Description of Action Item: Greg, Sandy, and Carl will frame the issue on
"Infrastructure for Districts to serve maps" and see where the following programs stand:
Gateway, Atlas, and EROS Data Center. Maybe, if there is something interesting on the near
horizon, then CPAC will invite Ken Lanfear to come to the next CPAC meeting to talk
about Gateway to the Earth.
A Gateway briefing document ahead of time would be important 2-weeks prior to the meeting so
educated questions could be asked. Also, invite Atlas, and EROS Data Center, and Enviromapper for
NWIS. CPAC needs to know if these programs are important to the
Districts. This will be submitted as an agenda item for the WRD Senior Staff Meeting.
Status/Comments: ON HOLD
(#13 & #33) Related to briefing Senior Staff about new technology and collaboration with the
geography discipline. Steve Hammond recommended that the topic be added to the January combined
session of WRD/NMD senior staff and the recommendation was not accepted. Presently, this time is not
on the agenda. |
NOV2000.HA.14
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Tom Wood
Description of Action Item: Tom will talk to Computer Associates (CA) regarding the
options to re-license DISSPLA and let CPAC know the results by email.
Status/Comments: Tom Wood sent e-mail to CPAC on 12/21/2000, subject
"DISSPLA status"
|
NOV2000.HA.15
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Tom Wood
Description of Action Item: Shawn Noble and Sun TAC will test NWIS and DISSPLA on Sun
Solaris 8 with the new Fortran compiler. Tom Wood will report the test results back to CPAC.
Status/Comments: E-mail message from Shawn Noble, 1/19/01 In January 2001,
Sun TAC began NWIS/DISSPLA testing, to be used as a basis for upgrading all WRD Sun servers from
Solaris 2.6 to Solaris 8. NWIS and Sun_TAC are working together to form a baseline of NWIS/DISSPLA
performance on the test machine at Solaris 2.6. They will make sure the test machine is running as
expected before upgrading it to Solaris 8. Once the Solaris 2.6 baseline testing is successful, the
test machine will be upgraded to Solaris 8 and the tests run again. If/when that test is successful,
Sun_TAC and NWIS will solicit sites (including sites managed by individual Sun TAC members) to upgrade
their machines. Once this beta testing is deemed successful, Solaris 8 and upgrade instructions
will be released to all sites. NWIS will perform the initial tests and beta tests using their PreVue.
As of 1/11/2001, the GW baseline tests had been completed.
|
NOV2000.HA.16
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: CPAC members
Description of Action Item: After Lorna Schmid issues NatWeb permanent position
advertisements, CPAC members will encourage personnel to apply for the positions.
Status/Comments: IN PROGRESS
Reference following Email from Lorna Schmid, 1/31/2001:
--On the "permanent position/advertisements" I'm not sure where we are. For the initial
implementation I think it will be detailees we'll be looking for -- that may need even more
help from "you guys". I'm not sure exactly what ITAC wants in a blurb, let me know if this
is too much, but here's the draft I have for tasks:
Tasks:
- Conversion of files being served from local WWW servers to replicated copies being
served from the 3 national modules. Will include resolving problems associated
with, for example:
- links to home directories
- symbolic links
- URL's
- sources/files that won't translate into NatWeb
- server side includes
- cgi-bin
- references to things that are not resident in the htdocs area
- other unforeseen administration tasks
- Will use linklint program to test the corrections
|
NOV2000.HA.17
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Mike Slifer
Description of Action Item: The NWIS External Review Committee will meet with Bob
Hirsch, present a draft charge, and Bob Hirsch will respond to the scope of the task. The CPAC
NWIS external review committee members are: Mike Slifer, Chair; Steve Brady; Steve Hammond;
Alan Lumb; Scott McEwen; Nelson Williams; Sandy Williamson; and a discipline office representative.
Status/Comments: Completed -- Reference:
NWIS External Review
Comments from Mike Slifer, 12/4/2000,
NWIS Review
Recommendations 4/10/2001, and
Review Recommendations
presentation from Mike Slifer, 4/16/2001
|
NOV2000.HA.18
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Scott McEwen & Carl Goodwin
Description of Action Item: Scott McEwen is to draft a letter for Carl Goodwin/CPAC to
send to OSW to reconsider the "polling software for non-GOES sites" support issue.
Status/Comments: SUPERSEDED -- See attached
record of related issues and
correspondence regarding this topic
|
NOV2000.HA.19
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Scott McEwen
Description of Action Item: Scott to have the five or six Districts involved define
what the actions would be to support the "polling software for non-GOES sites" support issue.
Status/Comments:
|
NOV2000.HA.20
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Carl Goodwin & Charlie Merk
Description of Action Item: Carl and Charlie are to put together a presentation for
WRD Senior Staff covering the goals for the last year and the goals for the next year (the 3 CPAC goals
or a wrapper around the three goals. These goals were voted on to be: FUTCOM; field computer software
development issues and FRAMEMAKER viability). All CPAC members are to provide their ideas about the
list of accomplishments.
Status/Comments: COMPLETED -- CPAC summary of events
for Senior Staff. The briefing is presently on the agenda for Thursday, 1/25/2001 -- reference
ITAC Presentation Slides
1/29/2001 -- Bill Carswell reported that Carl Goodwin gave a great ITAC presentation last week at the
WRD Senior Staff Meeting.
|
NOV2000.HA.21
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Carl Goodwin
Description of Action Item: Carl to send an email to all WRD employees with an overview
of CPAC, its members, the constituency groups, this calendar year goals, and the previous calendar year
accomplishments Suggestions would be solicited from WRD employees. The CPAC URL would be advertised
in this one page email.
Status/Comments:
|
NOV2000.HA.22
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: CPAC subgroup
Description of Action Item: A CPAC subgroup is charged
to revise and update the CPAC Charter with the Bureau re-organization in mind. Bill Carswell,
Steve Hammond and Carl Goodwin and Charlie Merk will constitute this CPAC subgroup.
Status/Comments: IN PROGRESS -- Charter is
presently being revised should be ready for review by the group in January.
|
NOV2000.HA.23
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: CPAC subgroup
Description of Action Item: A CPAC subgroup will revise FUTCOM. The FUTCOM report will
be delivered with an eye on leading the Bureau Direction in light of the reorganization. This FUTCOM
will focus on the WRD DIS and NWIS Architectural Issues Team issues. CPAC suggested breaking down
this report topics into groups. Database and telecom futures are to be included. Suggested steps for
FUTCOM follow. Frame the state of computing in the water discipline to set the stage. Frame the premises.
Review issues of the AIT and prioritize. The team members would be led by Scott McEwen and would include
Greg Allord, Nelson Williams, and a GIS representative. Scott McEwen will draft a charge back to CPAC
within the thirty days.
Status/Comments:
Draft FUTCOM4 Report, 1/26/01.
|
NOV2000.HA.24
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: CPAC
Description of Action Item: CPAC charged a subgroup on Emerging Technology, along
the lines of what Sandy Williamson has performed. The team would include Sandy Williamson, Mike Slifer,
Gary McMahon and Charlie Merk to coordinate the emerging technology topics and CPAC presentations.
Status/Comments:
|
NOV2000.HA.25
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Steve Hammond
Description of Action Item: Steve will investigate the use
of investment or seed money dollars would be needed using the ICOM model or some other construct. The
goal is to have Senior Staff buy off on the seed money concept. One suggestion is to have seed money
for the hardware and/or software rather than huge competition for a project and salaries.
Status/Comments: Steve Hammond discussed this item with Steve Blanchard.
The chances of that happening this year are slim right now but it is possible depending on
how the next few months unfold financially for the bureau and the discipline. |
NOV2000.HA.26
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Carl Goodwin
Description of Action Item: Three high priority DIS-related funding needs: Security,
NT TAC and the increased fund for filed support for third-party software. CPAC feels that it is very
important to fund these priorities. The CPAC Chair will send a memo to Steve Blanchard who will pass
this onto the WRD Senior Staff regarding the importance of these three critical funding needs.
Status/Comments: COMPLETED -- This is an agenda for the
next meeting.
|
NOV2000.HA.27
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Carl Goodwin and the CPAC Charter subgroup
Description of Action Item: Action Item: Carl and the Charter subgroup will review the CPAC
charter with respect to rotations terms and notify the Regional Hydrologist requesting the selection of
replacement CPAC members.
Status/Comments: COMPLETED -- This is an agenda for the
next meeting.
|
NOV2000.HA.28
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Nelson Williams & Loren Kloft
Description of Action Item: The action item is to have Nelson Williams and Loren Kloft be
the CPAC liaison with Lorna Schmid and develop a one-page document describing WRD recommendations for web
accessibility for the disabled. Two weeks before the next meeting.
Status/Comments: COMPLETED -- The following are the
documents that Nelson Williams and Loren Kloft prepared for the ITAC discussion of the web accessibility
issues:
Web Accessibility write-up and
Section 508 document
|
NOV2000.HA.29
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Tom Wood
Description of Action Item: Tom to invite Bob Wakelee to the February CPAC meeting
for a discussion on telecommunications support for publishing activities. Improved bandwidth for the
cooperators - possibly through the Univerities is being investigated by OPS and should be reported on
during the agenda item.
Status/Comments: COMPLETED
|
NOV2000.HA.30
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Greg Allord
Description of Action Item: Greg will provide a draft to communicate the publishing
plans and activities. Including the District Issues concerning software publishing packages, rationale,
analysis, conclusions, "what's on the horizon", etc. Greg will send an email as a "heads
up and awareness" to CPAC and WRD publishing employees, many of whom may not have attended the PIG
Conference this last summer. Feedback in the form of review comments will be soliticited.
Due date is November 16
Status/Comments: COMPLETED -- DRAFT provided by
Scott McEwen:
http://wwwrcolka.cr.usgs.gov/uo/comp/pubs.html
|
NOV2000.HA.31
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Carl Goodwin & Charlie Merk
Description of Action Item: The next CPAC meeting is in Columbus, Ohio. Carl will
validate with the Ohio District Chief. Carl will find out who the District contact should be for
computer support and logistics; and then notify Charlie Merk who will coordinate the logistics.
The dates are January 30 to February 1.
Status/Comments: COMPLETED
|
NOV2000.HA.32
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Carl Goodwin
Description of Action Item: The CPAC meeting in the Southeastern Region will be
scheduled for May, 2001. Carl will check with the Regional Hydrologist for the following choice of
dates: May 8-10 and May 1-3. Some suggestions for locations include: Tennessee and
Alabama.
Status/Comments: COMPLETED -- The ITAC meeting
is scheduled for May 1-3, 2001 in Tennessee.
|
NOV2000.HA.33
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Bill Carswell
Description of Action Item: Bill will see that the WEB-MAP issue gets on the agenda
for the WRD Senior Staff meeting with NMD representatives in January 2001
Status/Comments: COMPLETED -- (#13 & #33) Related
to briefing Senior Staff about new technology and collaboration with the geography discipline. Steve
Hammond recommended that the topic be added to the January combined session of WRD/NMD senior staff.
Sandy Williamson presented a briefing entitled "Infrastructure for Serving Maps in the District
Office" the WRD Senior Staff in January, 2001.
|
NOV2000.HA.34
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Steve Hammond
Description of Action Item: Steve will investigate the charter of the SPIDER group
and report back to CPAC.
Status/Comments: Steve Hammond spoke with Lorna Schmid and
asked her to provide an update. Steve expects to hear from her soon. |
NOV2000.HA.35
Hawaii
District Meeting 10/31-11/2/2000
|
Person(s) Assigned: Mark Nilles & Steve Hammond
Description of Action Item: Mark will look into the "framed" question regarding
Datums for Hawaii. Datum should be relative to mean sea level. This question was brought up at the town
meeting to CPAC as a need with respect to the NWISWeb page and the ability to display the ground-water
data.
Status/Comments: Colleen Babcock, 2/2/2001 -- provided the following answers to questions
regarding the Hawaii datum issue:
- Q.
-- Could you provide me the status of the Hawaii datum issue?
A. -- The Old Island datum issue is on track for release with
NWIS 4_1.
- Q.
-- Has the NWIS Ground Water User Group (GWUG) analyzed/reviewed
and provided
requirements?
A. -- Yes, Gail Keeter (Sacramento) took the lead on this and it's in
NWIS' lap now.
- Q.
-- Has GWUG given it a priority?
A. -- GWUG considers this a high priority.
- Q.
-- Have we determined how/when to implement?
A. -- This will be include in NWIS 4_1, changes are required to the
reference list, which is a very minor
change. Changes are required to the
ground-water retrieval program which
are more serious.
|