AI Identifier |
Person(s) Assigned / Description of Action Item / Status of AI/Comment |
Oct2003.SD.1 |
Person(s) Assigned: Brian
Issue: Issue Paper on limitations of
current real-time hydrologic data delivery system Description of Action Item: Draft an issue
paper to define the limitations of the current
real-time hydrologic data delivery system within the
scope of hydrologic warning, raise awareness to the
impact of these limitations, and explore
cost-effective options to remove these limitations to
allow for truly real-time data presentation. The
South Dakota District will be used as a model to
define the needs and requirements of a real-time data
delivery system. Status of AI/Comment: 12/10/03 update
-- Brian needs to complete documentation and provide
a URL for information collected to date. 3/12/04 update -- No progress; nothing from
Ralph Teller yet. 4/9/04 update -- Brian will have a paper ready for the Alaska meeting. COMPLETED |
Person(s) Assigned: Kevin
Issue: Internal web pages Description of Action Item: Lorna to propose an
enterprise solution for securely serving internal Web pages
using NatWeb Status of AI/Comment: 12/10/03 update -- Need
to clarify and communicate what is needed to distinguish
between public and private servers. Kevin is
working with Karen Klima. Jessie will contact Karen. |
Status of AI/Comment: 2/04 meeting update -- REMOVED AS AN ACTION ITEM|
Oct2003.SD.3 |
Person(s)
Assigned: Jessie Alvarez
Issue: NSF Mounts Description of Action Item: Verify if NFS mounts are
allowed between the Main District office and their tail
circuits, which have no other outlet to the Internet.
Status of AI/Comment: COMPLETED -- Can do NSF mounts. |
Oct2003.SD.4 |
Person(s) Assigned: Joel
Issue: Data transfer/integrity issues with NWIS upgrade Description of Action Item: Data Transfer or
integrity issues following previous NWIS upgrade. Joel will
follow-up on the South Dakota data integrity problems; a
Problem Report number (from NWIS GNATS) should have been
issued. Joel will check on its status and report back to
NWIS, SW User Group, and ITAC. Status of AI/Comment: 12/10/03 update -- Need
to send a reminder requesting an update. COMPLETED |
Oct2003.SD.5 |
Person(s) Assigned:
Greg
Issue: Alexandria software
Description of Action Item: Brenda Althow of SD
recommended investigating Alexandria software to the USGS
Libraries. Greg will explore the use of Alexandria software
with Chief Librarian. Status of AI/Comment: Greg looked into this, but the
Library is not interested in pursuing use of the
software. COMPLETED |
Oct2003.SD.6 COMPLETED |
Person(s) Assigned:
Scott
Issue: Cyber Seminar on seamless data server Description of Action Item: Scott will coordinate
Cyber seminar on seamless data server. Status of AI/Comment: 12/10/03 update-- Scott
will work on this. He would like to test with Studies
and District Chiefs first. 3/4/04 update-- Katherine sent email to
ITAC 2/23/04 stating that Mark Demulder was very enthusiastic about
doing this, per his 2/18/04 email distributed to Geography Senior
Staff. 3/12/04 update-- Katherine -- Did this for National Map
briefings; not for seamless server. Scott - David Greenlee gave briefing in SD; Dave should let
employees know that seamless servers are available. Katherine will
contact Dave and ask for the cyber seminars. Scott will help
arrange them. Sandy can set them up for Dave. Sonja Sebree wants to help as she works on these in
Nebraska. It would be a good cyber seminar. She can be reviewer of dry
run, as a District GIS person. 4/9/04 update-- Dave is connected and cyber presentation is
scheduled for a dry run. 5/3/04 update-- COMPLETED With
Katherine Lins' endorsement, Sandy Williamson and Curtis Price
coordinated a CyberSeminar presented on April 21, 2004, by Dave and
Sue Greenlee of the EROS Data Center, entitled: "What the National Map
can do for Water GIS Folks." This presentation was attended by
approximately 181 attendees in 42 states (nearly as many districts).
The presentation was such a hit that it will be repeated at a later
date, yet to be determined. [Sandy, can you provide the URL to Dave
and Sue's PowerPoint?] |
Oct2003.SD.7 |
Person(s) Assigned:
Sonya
Issue: Dates for next ITAC meetings Description of Action Item: Get dates for February
ITAC meeting and June meeting. Status of AI/Comment: COMPLETED |
Oct2003.SD.8 |
Person(s) Assigned: Katherine
Issue: Karen Klima invitation to ITAC meeting Description of Action Item: Invite Karen Klima to next ITAC
meeting, to give update on Enterprise Web. Status of AI/Comment: COMPLETED |
Oct2003.SD.9 |
Person(s) Assigned:
Jessie
Issue: Elimination of distributed DMZs Description of Action Item: Will find out deadline
for elimination of distributed DMZs. Is it February 2004, a
year from waiver request, or August 2004, a year from DMZ
implementation? Status of AI/Comment: COMPLETED -- August 2004. |
Person(s) Assigned:
Scott McEwen
Issue: DMZ futures Description of Action Item: Will work with Charlie
Merk or Katherine Lins to get memo out about DMZ futures by
end of November 2003. Status of AI/Comment: 12/10/03 update --
Memo is almost complete. FTP consolidation not in
place yet. Suggested that Jessie send memo out now
and more information will be sent later. Lester North, ITSOT lead, will verify if DOI will hold us to that
date. Not hardpressed with August 2004 deadline. Send memo asking
Districts if they would rather have some information rather than
nothing. Action item for Steve King? Jessie -- two-part action item - how do offices prepare a business
case? There is an update on DMZs in place (example, ArcIMS server) --
Jessie can track. Jessie will report back to ITAC. 3/12/04 update -- Not done. 4/9/04 update -- No update. 5/3/04 update -- Two recent actions have reduced the impact of
the temporary DMZs: 1) The Enterprise FTP Service was
randomly announced to various IT staff early March 2004. I propose
that the ITAC request the GIO to announce this service to all USGS
employees. NatWeb has provided excellent documentation for how to
migrate to NatWeb and/or utilize "reverse proxy" to their public
web sites. |
|
Oct2003.SD.11 |
Person(s) Assigned:
Nelson
Issue: EMS situation Description of Action Item: ITAC to send letter to
Karen Siderelis regarding EMS situation. Letter to Karen
should focus on service level agreement (SLA). Status of AI/Comment: 12/10/03 update -- EMS
became a project that CTO is tracking. Ask Scott to
recirculate letter, and leave it with Katherine after
final comments have been made. COMPLETED -- There will be verbal
communication.
|
Oct2003.SD.12 |
Person(s) Assigned:
Tom Wood and Harry House
Issue: DBTAC Charter Description of Action Item: Write a charter for
the DBTAC. Kevin offered $30,000 to fund the DB user group.
Status of AI/Comment: 12/10/03
update -- Scott needs to finish the charter. Draft members
(ie. Steve Brady, Harry House, Steve Kessler?) to help draft
charter. Use SUNTAC Charter as a guide. 2/10/04 update -- Tom believes Harry House drafted a charter. Harry will talk to Tom Wood about this. 3/12/04 update -- Scott - Will turn into a Bureau Charter. This has the support of Kevin. 4/9/04 update -- No update. 5/3/04 update -- Tom Wood, Harry House, Alan Davidson, and Scott McEwen held a conference call on May 3, 2004. The outcomes of that call are 1) for Tom to seek clarification/approval from Kevin Gallagher on scope and funding (at this point in the FY) of both a Bureau-wide Oracle support team and a Bureau-wide Information Management Technical Advisory Team; 2) for the foursome to document expectations of a "lead person" funded by the GIO to administer the USGS/Oracle contract, stand up a USGS Oracle Help Team (GS Help Oracle), coordinate in-house training, and more; and 3) further define the Information Management TAC. The foursome recognizes that Oracle support and the original DB_TAC concept are separate activities. Likewise, the foursome decided to shift focus from a Data Base TAC to an Information Management TAC, similar in purpose but more focused on information management rather than just data base technology. 7/2/04 update -- Pending 10/01/04 update -- Scott was on a conference call in May. This should not be Scott's item, but we need to hear his interpretation. We'll assign it to Scott, and we still need update for charter status. We may eventually take this off Action item list. Sandy will share the charter; we'll discuss for a few minutes at ITAC meeting in November - Is it our issue or not? 11/17/04 update -- CANCELLED. We're out of the picture now; harry House is doing this now.
|
Oct2003.SD.13 CANCELLED |
Person(s) Assigned:
Jessica
Issue: BITSM Description of Action Item: Request that ITSOT
write-up a policy, which the BITSM can stamp-off, for people
that work from home and need to access:
Status of AI/Comment: 12/10/03 update -- It's better to have some guidelines now. Implement something in Water until there is further guidance from Bureau and DOI? Scott will find out more. Jessie will give Katherine document of guidelines to send out.
|
Oct2003.SD.14 |
Person(s) Assigned:
Kevin
Issue: Money for field computing program Description of Action Item: Will ask Bureau for $30,000-40,000 for the handheld-field computing program. Status of AI/Comment: 12/10/03 update --
Charlie will check with Kevin. 2/10/04 update
--COMPLETED -- Kevin has
agreed to provide $30K for this effort from his FY04 budget.
Reference Tom Wood email
of -- 2/10/2004 |
Oct2003.SD.15 |
Person(s) Assigned:
Susan (NWIS)
Issue: TkG2 programmer Description of Action Item: Will find a replacement
programmer to maintain TkG2. Status of AI/Comment: COMPLETED |
Oct2003.SD.16 |
Person(s) Assigned:
Joel Johnson
Issue: SWUG Agenda for December meeting Description of Action Item: Add to SWUG agenda for
December meeting: Discussion and review of possible strategies
that could be used to provide redundant or back-up
capabilities for the acquisition of non-GOES (radio, phone)
real-time data. The backup would need to be able to acquire
the data from the sensor and then feed the data to either the
district NWIS or the NWIS-RT server. Programs that could be
implemented on NWIS-RT will implement a "depot" for accepting
the data from the non-GOES telemetry, but that data must be
acceptable by SATIN/DECODES/SENTRY for processing. Pursue
HYDSTRA and Jessie's IL contacts. Results reported back to
ITAC for recommendation. [Note: This AI is not in minutes.]
Status of AI/Comment: 12/10/03 update --
Meeting is going on now. COMPLETED |
TOP #top ITAC home /usgs/itac/ South Dakota Meeting /usgs/itac/minutes/031007SD_agenda.html
Address questions or comments to: Charlie Merk
cfmerk on 703-648-5680 or
Feedback on the web page:
ITAC Webmaster
USGS :: ITAC :: Water :: Water Intranet :: WICAS
Kym Burns, ITAC Executive
Secretary
(703) 648-5609