ITAC ACTION ITEMS - Status Report
October 7-9, 2003

South Dakota District Office -- Rapid City, South Dakota

ITAC membership email abbreviation:   GS-W ITAC


Legend for AI Identifier:   Oct2003SD.1 = month, year, location, & action item number for each ITAC meeting.
Status of AI/Comment:2/04 meeting update -- REMOVED AS AN ACTION ITEM

AI Identifier

Person(s) Assigned / Description of Action Item / Status of AI/Comment

Oct2003.SD.1
COMPLETED

Person(s) Assigned:   Brian

Issue: Issue Paper on limitations of current real-time hydrologic data delivery system

Description of Action Item: Draft an issue paper to define the limitations of the current real-time hydrologic data delivery system within the scope of hydrologic warning, raise awareness to the impact of these limitations, and explore cost-effective options to remove these limitations to allow for truly real-time data presentation. The South Dakota District will be used as a model to define the needs and requirements of a real-time data delivery system.

Status of AI/Comment: 12/10/03 update -- Brian needs to complete documentation and provide a URL for information collected to date.

3/12/04 update -- No progress; nothing from Ralph Teller yet.

4/9/04 update -- Brian will have a paper ready for the Alaska meeting.

COMPLETED

Oct2003.SD.2

Person(s) Assigned:   Kevin

Issue: Internal web pages

Description of Action Item: Lorna to propose an enterprise solution for securely serving internal Web pages using NatWeb

Status of AI/Comment: 12/10/03 update -- Need to clarify and communicate what is needed to distinguish between public and private servers. Kevin is working with Karen Klima. Jessie will contact Karen.

Oct2003.SD.3
COMPLETED

Person(s) Assigned:   Jessie Alvarez

Issue:   NSF Mounts

Description of Action Item: Verify if NFS mounts are allowed between the Main District office and their tail circuits, which have no other outlet to the Internet.

Status of AI/Comment: COMPLETED -- Can do NSF mounts.

Oct2003.SD.4
COMPLETED

Person(s) Assigned:   Joel

Issue:  Data transfer/integrity issues with NWIS upgrade

Description of Action Item: Data Transfer or integrity issues following previous NWIS upgrade. Joel will follow-up on the South Dakota data integrity problems; a Problem Report number (from NWIS GNATS) should have been issued. Joel will check on its status and report back to NWIS, SW User Group, and ITAC.

Status of AI/Comment: 12/10/03 update -- Need to send a reminder requesting an update.

COMPLETED

Oct2003.SD.5
COMPLETED

Person(s) Assigned:   Greg

Issue: Alexandria software 

Description of Action Item: Brenda Althow of SD recommended investigating Alexandria software to the USGS Libraries. Greg will explore the use of Alexandria software with Chief Librarian.

Status of AI/Comment: Greg looked into this, but the Library is not interested in pursuing use of the software. COMPLETED

Oct2003.SD.6 COMPLETED

Person(s) Assigned:   Scott

Issue: Cyber Seminar on seamless data server

Description of Action Item: Scott will coordinate Cyber seminar on seamless data server.

Status of AI/Comment: 12/10/03 update-- Scott will work on this. He would like to test with Studies and District Chiefs first.

3/4/04 update-- Katherine sent email to ITAC 2/23/04 stating that Mark Demulder was very enthusiastic about doing this, per his 2/18/04 email distributed to Geography Senior Staff.

3/12/04 update-- Katherine -- Did this for National Map briefings; not for seamless server.

Scott - David Greenlee gave briefing in SD; Dave should let employees know that seamless servers are available. Katherine will contact Dave and ask for the cyber seminars. Scott will help arrange them. Sandy can set them up for Dave.

Sonja Sebree wants to help as she works on these in Nebraska. It would be a good cyber seminar. She can be reviewer of dry run, as a District GIS person.

4/9/04 update-- Dave is connected and cyber presentation is scheduled for a dry run.

5/3/04 update-- COMPLETED With Katherine Lins' endorsement, Sandy Williamson and Curtis Price coordinated a CyberSeminar presented on April 21, 2004, by Dave and Sue Greenlee of the EROS Data Center, entitled: "What the National Map can do for Water GIS Folks." This presentation was attended by approximately 181 attendees in 42 states (nearly as many districts). The presentation was such a hit that it will be repeated at a later date, yet to be determined. [Sandy, can you provide the URL to Dave and Sue's PowerPoint?]

Oct2003.SD.7
COMPLETED

Person(s) Assigned:   Sonya

Issue: Dates for next ITAC meetings

Description of Action Item: Get dates for February ITAC meeting and June meeting.

Status of AI/Comment: COMPLETED

Oct2003.SD.8
COMPLETED

Person(s) Assigned:   Katherine

Issue: Karen Klima invitation to ITAC meeting

Description of Action Item: Invite Karen Klima to next ITAC meeting, to give update on Enterprise Web.

Status of AI/Comment: COMPLETED

Oct2003.SD.9
COMPLETED

Person(s) Assigned:   Jessie

Issue: Elimination of distributed DMZs

Description of Action Item: Will find out deadline for elimination of distributed DMZs. Is it February 2004, a year from waiver request, or August 2004, a year from DMZ implementation?

Status of AI/Comment: COMPLETED -- August 2004.

Oct2003.SD.10

Person(s) Assigned:   Scott McEwen

Issue: DMZ futures

Description of Action Item: Will work with Charlie Merk or Katherine Lins to get memo out about DMZ futures by end of November 2003.

Status of AI/Comment: 12/10/03 update -- Memo is almost complete. FTP consolidation not in place yet. Suggested that Jessie send memo out now and more information will be sent later.

Lester North, ITSOT lead, will verify if DOI will hold us to that date. Not hardpressed with August 2004 deadline. Send memo asking Districts if they would rather have some information rather than nothing. Action item for Steve King?

Jessie -- two-part action item - how do offices prepare a business case? There is an update on DMZs in place (example, ArcIMS server) -- Jessie can track. Jessie will report back to ITAC.

3/12/04 update -- Not done.

4/9/04 update -- No update.

5/3/04 update -- Two recent actions have reduced the impact of the temporary DMZs: 1) The Enterprise FTP Service was randomly announced to various IT staff early March 2004. I propose that the ITAC request the GIO to announce this service to all USGS employees. NatWeb has provided excellent documentation for how to migrate to NatWeb and/or utilize "reverse proxy" to their public web sites.

7/2/04 update -- Pending; Temporary DMZs through August 2004; Kevin Gallagher suggested to minimize use. Try to solve with proxy servers.

 

Oct2003.SD.11
COMPLETED

Person(s) Assigned:   Nelson

Issue: EMS situation

Description of Action Item: ITAC to send letter to Karen Siderelis regarding EMS situation. Letter to Karen should focus on service level agreement (SLA).

Status of AI/Comment: 12/10/03 update -- EMS became a project that CTO is tracking. Ask Scott to recirculate letter, and leave it with Katherine after final comments have been made.

COMPLETED -- There will be verbal communication.

Oct2003.SD.12
CANCELLED

Person(s) Assigned:   Tom Wood and Harry House

Issue: DBTAC Charter

Description of Action Item: Write a charter for the DBTAC. Kevin offered $30,000 to fund the DB user group.

Status of AI/Comment: 12/10/03 update -- Scott needs to finish the charter. Draft members (ie. Steve Brady, Harry House, Steve Kessler?) to help draft charter. Use SUNTAC Charter as a guide.

2/10/04 update -- Tom believes Harry House drafted a charter. Harry will talk to Tom Wood about this.

3/12/04 update -- Scott - Will turn into a Bureau Charter. This has the support of Kevin.

4/9/04 update -- No update.

5/3/04 update -- Tom Wood, Harry House, Alan Davidson, and Scott McEwen held a conference call on May 3, 2004. The outcomes of that call are 1) for Tom to seek clarification/approval from Kevin Gallagher on scope and funding (at this point in the FY) of both a Bureau-wide Oracle support team and a Bureau-wide Information Management Technical Advisory Team; 2) for the foursome to document expectations of a "lead person" funded by the GIO to administer the USGS/Oracle contract, stand up a USGS Oracle Help Team (GS Help Oracle), coordinate in-house training, and more; and 3) further define the Information Management TAC. The foursome recognizes that Oracle support and the original DB_TAC concept are separate activities. Likewise, the foursome decided to shift focus from a Data Base TAC to an Information Management TAC, similar in purpose but more focused on information management rather than just data base technology.

7/2/04 update -- Pending

10/01/04 update -- Scott was on a conference call in May. This should not be Scott's item, but we need to hear his interpretation. We'll assign it to Scott, and we still need update for charter status. We may eventually take this off Action item list.

Sandy will share the charter; we'll discuss for a few minutes at ITAC meeting in November - Is it our issue or not?

11/17/04 update -- CANCELLED. We're out of the picture now; harry House is doing this now.

 

Oct2003.SD.13 CANCELLED

Person(s) Assigned:   Jessica

Issue: BITSM

Description of Action Item: Request that ITSOT write-up a policy, which the BITSM can stamp-off, for people that work from home and need to access:

  • Data on their local PC
  • Data on a Server
  • To authenticate to a "local" AD Domain when working from home-and a policy for cooperators to be allowed to ssh w/o a static IP (leave ssh open to the public) to NWIS Servers.

Status of AI/Comment: 12/10/03 update -- It's better to have some guidelines now. Implement something in Water until there is further guidance from Bureau and DOI? Scott will find out more. Jessie will give Katherine document of guidelines to send out.

2/10/04 update -- ITSOT to develop draft policy to review and approve. White Paper developed on Remote Access to be submitted to BITSM for approval.

3/12/04 update -- Jessie was not on conference call to report on status.

4/9/04 update -- No update.

CANCELLED -- Picked up by ITSOT.

Oct2003.SD.14
COMPLETED

Person(s) Assigned:   Kevin

Issue: Money for field computing program

Description of Action Item: Will ask Bureau for $30,000-40,000 for the handheld-field computing program.

Status of AI/Comment: 12/10/03 update -- Charlie will check with Kevin.

2/10/04 update --COMPLETED -- Kevin has agreed to provide $30K for this effort from his FY04 budget. Reference Tom Wood email of -- 2/10/2004

Oct2003.SD.15
COMPLETED

Person(s) Assigned: Susan (NWIS)

Issue: TkG2 programmer

Description of Action Item: Will find a replacement programmer to maintain TkG2.

Status of AI/Comment: COMPLETED

Oct2003.SD.16
COMPLETED

Person(s) Assigned:   Joel Johnson

Issue: SWUG Agenda for December meeting

Description of Action Item: Add to SWUG agenda for December meeting: Discussion and review of possible strategies that could be used to provide redundant or back-up capabilities for the acquisition of non-GOES (radio, phone) real-time data. The backup would need to be able to acquire the data from the sensor and then feed the data to either the district NWIS or the NWIS-RT server. Programs that could be implemented on NWIS-RT will implement a "depot" for accepting the data from the non-GOES telemetry, but that data must be acceptable by SATIN/DECODES/SENTRY for processing. Pursue HYDSTRA and Jessie's IL contacts. Results reported back to ITAC for recommendation. [Note: This AI is not in minutes.]

Status of AI/Comment: 12/10/03 update -- Meeting is going on now.

COMPLETED


Click on a major heading to other links!

TOP #top ITAC home /usgs/itac/ South Dakota Meeting /usgs/itac/minutes/031007SD_agenda.html

Address questions or comments to: Charlie Merk cfmerk on 703-648-5680 or
Feedback on the web page:   ITAC Webmaster

U.S. Department of the Interior, U.S. Geological Survey
Maintainer: OI AS Unit
Last update: Monday, 24-Jul-2006 18:06:56 EDT
Privacy Statement || Disclaimer
URL: http://water.usgs.gov/usgs/itac/docs/SD_ai031007.html

USGS :: ITAC :: Water :: Water Intranet :: WICAS

Address questions or comments to:

Kym Burns, ITAC Executive Secretary
(703) 648-5609


U.S. Department of the Interior, U.S. Geological Survey
Maintainer: OWI WICAS Program
Last update: Monday, 24-Jul-2006 18:06:56 EDT
Privacy Statement || Disclaimer
[an error occurred while processing this directive] URL: http://water.usgs.gov