Date: Fri, 25 Apr 1997 17:50:58 -0500
To: nawqa91pc

From: "Timothy L Miller, Chief, NAWQA, Reston, VA" <tlmiller> (Timothy
L. Miller)
X-Sender: tlmiller@130.11.51.209
Subject: final Operational SWQ LIP guidelines, 1997

Cc: "Sarahnell L Laible, Secretary, Reston, VA" <sllaible>,
"Rosemary Musson, Office Automation Assistant, Reston, VA" <rmusson>,
"Walton H Low, Supv Hyd, Boise, ID" <wlow>,
"Jeffrey T Armbruster, Asst. Reg. Hydr.-NAWQA, Norcross, GA" <armbrust>,
"Ivan C James II, Asst. Reg. Hydrologist-NAWQA, Denver, CO" <ijames>,
"Michael C Yurewicz, Asst. Reg. Hydrol.-NAWQA, Reston, VA" <mcyurewi>,
"Marc A Sylvester, Asst. Reg. Hydrologist-NAWQA, Menlo Park, CA" <sylvest>,
"William G Wilber, National Synthesis Coordinator, Reston, VA" <wgwilber>,
"Robert S Williams Jr., Hydrologist, Denver, CO" <bobwill>,
"Dennis R Helsel, Hydrologist, Denver, CO" <dhelsel>,
"Martin E Gurtz, Hydrologist, Raleigh, NC" <megurtz>,
"Robert J Gilliom, Supv. Hydrologist, Sacramento, CA" <rgilliom>,
"John S Zogorski, Supervisory Hydrologist, Rapid City, SD" <jszogors>,
"O. Lehn Franke, Hydrologist, Denver, CO" <olfranke>,
"David K Mueller, Hydrologist, Denver, CO" <mueller>,
"Larry J Puckett, Ecologist, Reston, VA" <lpuckett>,
"Jonathon C Scott, Hydrologist, Oklahoma City, OK" <jon>,
"Jeffrey D Stoner, Supervisory Hydrologist, Mounds View, MN" <stoner>

In Reply Refer To:
Mail Stop 413

SENT VIA EMAIL

MEMORANDUM


April 25, 1997

TO:	Study-Unit Chiefs, 1991 National Water-Quality Assessment Program 

FROM:	Timothy L. Miller, Chief, National Water-Quality Assessment Program 

SUBJECT:Operational surface-water quality Low Intensity Phase guidelines,
        1997, for the 1991 Study Units 

REPLY REQUESTED BY MAY 16, 1997

This memorandum issues the 1997 operational surface-water quality Low
Intensity Phase (LIP) guidelines for the 1991 Study Units
(attachment). The 1997 operational ground-water quality LIP guidelines
are forthcoming.

Forty-seven LIP sites have been selected (10 Study Unit-wide
integrators, 9 sub-basin integrators, 7 urban and 15 agricultural
indicator, 6 paired reference sites). For the base interval-sampling
frequency, monthly water samples, annual taxa samples, and triennial
bottom sediment and tissue samples will be collected for the detection
of trends. Additional samples for extreme flow conditions must be
justified and approved.

The base interval-sampling frequency should begin as soon as
practicable in FY1997. The LIP sampling plan and budget should be
prepared and submitted to the following individuals by May 16, 1997:
nawqanlt@mailrvares.er.usgs.gov, nawqanst@mailrvares.er.usgs.gov,
tjlopes, mkoterba, jdmartin, lshelton, sllaible, rmusson wlow, and
district management.

The allocation of additional funds for 1997 LIP data collection will
immediately follow the review and approval of the sampling plan and
budget.

The submitted plans will be reviewed by the NST, Walton Low, and
NLT. NST will provide any review comments of the plans by June 6,
1997. Conference calls among the individual Study Units, ARHN, NST,
and Walton Low will be scheduled during mid-June to discuss any
unresolved issues regarding the sampling plans and
justifications. Please include the Study Unit contact(s) (email ID and
telephone number).

A Framemaker copy of the guidelines and tables are available via
ftp. server: 130.118.149.75 filename: /var/ftp/pub/lip97.fm and
lip97tables.fm


Attachment
cc:
********************************************************************** 
>>>>>>>>>>>>>>>>>>>>>>>>>>Print in Landscape<<<<<<<<<<<<<<<<<<<<<<<<<< 
**********************************************************************

OPERATIONAL SURFACE-WATER QUALITY LOW-INTENSITY PHASE GUIDELINES 1997

I. BACKGROUND

The primary objective of the Low-Intensity Phase (LIP) is to provide
an explicit design that is technically and fiscally prudent and meets
the objectives of trends assessment. The objectives of trend
assessment are to analyze past changes in water quality and to
identify, describe, and explain (as possible) current and future
changes and trends in water quality (Luoma and others, 1994). The
basis of the trend design of NAWQA is the characterization of the
temporally-fine but spatially-coarse LIP as a subset of the
temporally-coarse but spatially-fine High-Intensity Phase (HIP). One
data attribute necessary for a reasonable trend monitoring network is
that sampling intervals are fixed rather than event-based (Vecchia and
others, 1997). Event-based samples are not useful for trend detection
purposes because statistical procedures for including event-based
samples in trend estimation are not currently available.

Since the draft LIP operational plan by Sylvester (1995), Miller
(1995), and the National Leadership Team (1995), continued dialog
among the NLT, National Synthesis Team (NST), and the 1991 Study Units
have resulted in refinement to the surface-water quality portion of
the draft plan. Refinement to the plan focused on three areas: (1)
site selection, (2) constituents sampled, and (3) frequency of sample
collection. The plan, necessarily, will continually evolve as the
NAWQA program gathers and assesses new information on the
effectiveness of the LIP design.

II. SITE SELECTION

The selection of LIP surface-water sites was based on integrator,
indicator, and reference sites sampled during the High-Intensity Phase
nominated by the 1991 Study Units and the National Synthesis Team
(tables 1-5).

Table 1.--Low-intensity phase Study Unit Integrator Sites integrating
          all or most of the study unit (10).

SU   STAID   NAME                            COMMENTS				           KM2
CNBR 6805500 PLATTE R AT LOUISVILLE NE	     basin terminus,HIP IFS,NASQAN2                78149
REDN 5102500 RED R OF THE NO AT EMERSON MAN  basin terminus,HIP IFS,past NASQAN            92144
RIOG 8364000 RIO GRANDE AT EL PASO TX        basin terminus,HIP BFS,NASQAN2                94946
CONN 1184000 CONNECTICUT R AT THOMPSONVILLE  basin terminus,HIP BFS,past NASQAN            25050
LSUS 1578310 L SUSQUEHANNA R AT CONOWINGO MD basin terminus,HIP BFS,DW source,past NASQAN  70189
POTO 1646580 POTOMAC R AT WASH DC            basin terminus,HIP BFS,no bst,past NASQAN     29975
WHIT 3374100 WHITE R AT HAZLETON IN          basin terminus,HIP IFS,past NASQAN,NASQAN2    29290
SANJ 11303500SAN JOAQUIN R NR VERNALIS CA    basin terminus,HIP IFS,past NASQAN	           18939
USNK 13154500SNAKE R AT KING HILL ID         basin terminus,HIP BFS,past NASQAN,NASQAN2    92941
WILL 14211720WILLAMETTE R AT PORTLAND OR     basin terminus,HIP BFS,no bst,NASQAN2         28937

Table 2.--Low-intensity phase Study Unit Integrator Sites integrating
          a major sub-basin of the study unit (9).

SU   STAID   NAME                            COMMENTS                                      KM2
SPLT 6754000 S PLATTE R NR KERSEY CO         sub-basin,HIP BFS,v S Platte,N Platte,NASQAN2 25144
TRIN 8057410 TRINITY R BEL DALLAS TX         sub-basin,HIP BFS                             9372
HDSN 1357500 MOHAWK R AT COHOES NY           sub-basin,HIP IFS,paired w/Canajoharie Cr     9113
WMIC 4087000 MILWAUKEE R AT MILWAUKEE WI     sub-basin,HIP IFS                             1852
ACFB 2338000 CHATTAHOOCHEE R NR WHITESBURG GAsub-basin,HIP BFS                             6245
ALBE 2089500 NEUSE R AT KINSTON NC           sub-basin,HIP BFS,major N&P source            7021
GAFL 2318500 WITHLACOOCHEE R NR QUITMAN GA   sub-basin,HIP IFS,paired w/Little R           3864
CCPT 13351000PALOUSE R AT HOOPER WA          sub-basin,HIP IFS,ag dominant                 6380
NVBR 10350500TRUCKEE R AT CLARK NV           sub-basin,HIP BFS,urban dominant              4122

Table 3.--Low-intensity phase Urban Indicator Sites (7). 

SU   STAID   NAME                            COMMENTS                                      KM2
TRIN 8057200 WHITE ROCK CR AT DALLAS TX	     non-HIP BFS,stable,v Chambers                 172
SPLT 6714000 S PLATTE R AT DENVER CO         HIP IFS,stable,v Cherry                       10009
CONN 1209710 NORWALK R AT WINNIPAUK CT	     HIP IFS,nps-dominated,v Pequabuck R           85
POTO 1654000 ACCOTINK C NR ANNANDALE VA	     HIP IFS,v LSUS Cedar Run,NRP sampled          60
WHIT 3353637 L BUCK CR NR INDIANAPOLIS IN    HIP IFS,70% developed                         45
ACFB 2335870 SOPE CR NR MARIETTA GA          HIP IFS,stable,fully developed,v Peachtree    80
NVBR 94196783LAS VEGAS WASH NR LV            HIP IFS                                       2640

Table 4.--Low-intensity phase Agricultural Indicator Sites (15). 

SU   STAID   NAME                            COMMENTS                                      KM2
CNBR 6800000 MAPLE CR NR NICKERSON NE        HIP IFS,long-term WQ&bio data                 955
REDN 5082625 TURTLE R NR ARVILLA ND	HIP IFS
658
OZRK 7053250 YOCUM CR NR OAK GROVE AR	HIP IFS,paired w/N Sylamore
134
HDSN 1349150 CANAJOHARIE CR NR CANAJOHARIE HIP IFS,paired w/Mohawk 
155
LSUS 1555400 E MAHANTANGO CR AT KLINGERSTOWN HIP IFS,paired w/Bobs Cr,long-term data,stable 116
POTO 1621050 MUDDY C AT MOUNT CLINTON VA	HIP IFS,paired
w/Shennandoah R	37
WHIT 39434008SUGAR CR AT NEW PALESTINE IN HIP IFS 
246
WMIC 4072050 DUCK CR NR ONEIDA WI	HIP IFS,v. NBr Milwaukee R
247
ALBE 2091500 CONTENTNEA CR AT HOOKERTON NC HIP BFS 
1909
GAFL 2317797 LITTLE R NR TIFTON GA	HIP IFS,paired
w/Withlacoochee R	335
CCPT 12471400LIND COULEE WASTEWAY NR WARDEN HIP BFS integrator 
1820
SANJ 11272500MERCED R NR STEVINSON CA	HIP IFS integrator
3242
SANJ 11274538ORESTIMBA CR NR CROWS LANDING HIP IFS 
27
USNK 13092747ROCK CR AB AT TWIN FALLS ID	HIP IFS
623
WILL 14201300ZOLLNER CR NR MT ANGEL OR	HIP IFS,99%
ag,stable,paired w/L Abiqua Cr	39

Table 5.--Low-intensity phase Reference Sites paired with land use indicator (6).

SU	STAID NAME	COMMENTS
KM2
OZRK 7060710 N SYLAMORE CR NR FIFTY SIX AR HIP BFS,Benchmark,paired w/Yocum	150
TRIN 8051500 CLEAR CR NR SANGER TX	HIP BFS,relative, paired
w/White Rock Cr	773
LSUS 1559795 BOBS CR NR PAVIA PA	HIP BFS,paired
w/E.Mah.,EMAP site,no BS&T	43
ACFB 2337500 SNAKE CR NR WHITESBURG GA	HIP BFS,paired w/Sope
92
CCPT 12464770CRAB CR NR RITZVILLE WA	HIP IFS,ag relative
reference,spring-fed	1188
WILL 14200400L ABIQUA CR NR SCOTTS MILLS OR HIP BFS 
25


III. CONSTITUENTS AND SAMPLE COLLECTION FREQUENCY Table 6 lists the base site-sampling frequency and chemical constituents to be sampled. LIP surface-water quality sample collection should commence as soon as practicable in fiscal year 1997. The base interval-sampling frequency for trends is monthly for basin and sub-basin integrator sites (tables 1,2). For the NAWQA LIP/NASQAN2 sites (table 1, 5 sites; table 2, 1 site), additional high-flow samples should be justified and collected. For unusual flow-condition sites, additional samples may be proposed based on individual site stream-flow characteristics. Increases from the base-interval sampling frequency for trends should be proposed, justified, and costs estimated for review and approval. For high-variability sites, continuous specific conductance measurements may be proposed in addition to or in lieu of monthly major ion sample collection. Study Units interested in collecting both continuous specific conductance and monthly major ion data should propose, justify, and estimate costs for review and approval.

Water-quality constituents to be sampled monthly at all sites (tables 1-5) include major ions (S2701), nutrients (S2702), and suspended sediment. Pesticides (S2001/2010) will be sampled monthly only at integrator sites. During the LIP, pesticides (S2001/S2010) will be sampled twice per month at agricultural and urban indicator sites during a contiguous 6-month period of each year. Paired reference sites will be sampled once per month during the same contiguous 6-month period as the indicator sites. The 6-month period is the same each year at a particular site, but may vary somewhat among sites. Generally, HIP data should be used to pick the 6-month period centered on the greatest occurrence and concentrations of pesticides for each particular site. These 6-month periods may be adjusted somewhat after all proposed sampling plans are compiled in order to make very similar situations in the same region have the same 6-month period. Study Units interested in collecting monthly SOC/DOC (S2075) should propose, justify, and estimate costs for review and approval. 

Biological data collection include ANNUAL single-reach assessments of fish, invertebrate, and algal communities (RTH and QMH; DTH must be justified), and Level I habitat characterization. Tissue collections for organic compounds (S2101) and trace elements (S2200), and bed sediment for organic compounds (S2500) and trace elements (S2400) should be completed once every 3 years (triennial) beginning in 1997 and again in 2000. Continuous water temperature should be collected at all selected LIP sites. 


Table 6.--Base site-sampling and data collection frequency. 

Study Unit Sub-Basin	Agricultural Urban	Paired

Integrator1/ Integrator1/ Indicator2/ Indicator2/ Reference3/ 

Major ions monthly	monthly	monthly	monthly	monthly
(S2701)

Nutrients monthly	monthly	monthly	monthly	monthly
(S2702)

Pesticides monthly	monthly	2 per mo	2 per mo	1 per mo
(S2001/2010)	for 6 mo	for 6 mo	for 6 mo

Suspended monthly	monthly	monthly	monthly	monthly
Sediment

QA/QC	scheduled	scheduled	scheduled	scheduled scheduled

Taxa	annually	annually	annually	annually	annually
fish/alg/inv

BS&T	triennially triennially triennially triennially triennially
(S2101/2200)
(S2500/2400)

1/--NAWQA/NASQAN2 sites, add additional high-flow samples 2/--unusual or variant flow conditions, add additional samples 3/--sample 1 per month during same 6 months as the paired indicator site 


IV. LIP SAMPLING PLAN
The purpose for the LIP surface-water quality (SWQ) site sampling plan is to document the environmental setting, HIP sample summary, and LIP sampling schedule for each LIP site. The plan should document unusual hydrologic and other conditions that may affect water-quality conditions and also any proposed increases to the base sampling frequency and constituents. An example plan is given below. 

1. An overview of the study-unit LIP/HIP relation and why the LIP 
sites were chosen.

2. Monthly-mean hydrograph for the historic period of discharge 
record and 1991-present (or previous HIP period) and a flow- duration hydrograph showing past HIP and proposed sampling periods. The hydrographs provide insight to streamflow variability and the adequacy of the frequency of sample collection and constituents to be sampled. For urban and agricultural indicator sites, prepare a graph showing average monthly total herbicide and insecticide concentrations for one year overlayed with the proposed 6-month pesticide sampling period.

3. Site description for each LIP SWQ site. The intent of the 
description is to report hydrologic conditions that may affect stream water quality and support any proposed increases from the base sampling frequency. Table 7 is an example table listing site descriptive components.

Table 7.--USNK LIP SWQ site description. 


13154500	13092747
BASIN	SNAKE R AT	ROCK CR AT
CHARACTERISTICS	KING HILL,ID	TWIN FALLS,ID

Latitude, longitude	430008 1151206	423347 1142942

Area, square miles	35800	241
Percent of Study Unit 100	0.006

Geology	Quaternary/Tertiary	Quaternary/Tertiary
sedimentary, volcanics sedimentary, volcanics

Physiographic
province	Columbia Plateau	Columbia Plateau

Ecoregion	Snake R Basin/	Snake R Basin/
High Desert	High Desert

Percent agricultural
land use	21	24

Crop Group	wheat grains>50	wheat grains
potatoes>10	alfalfa>20

Percent urban
residential land use 0.29	1.05

Water use,Mgal/d,1995
irrigation	12684	-
public supply	71	-
domestic supply	18	-
industrial	165	-

Population
1990	425000	53580
1995	469000	59480

Environmental	stable agriculture	stable agriculture
influences	highly regulated	rapid population growth
streamflow	highly regulated
conversion of	streamflow
irrigation methods	conversion of
irrigation methods

LIP site pair	none	none


4. High Intensity Phase sample summary for each LIP SWQ site. 
This information will help determine what and when sampling was completed and whether particular flow conditions should be sampled, in addition to the routine monthly sampling. Table 8 is an example table listing site sample information from the HIP.


Table 8.--USNK High Intensity Phase sample summary. 


No. of
13154500	samples	No. of
Snake River	fixed	Period of samples Period of
at King Hill ID	interval Record	high-flow Record

Major Ions
S2701	36	Mar93-Jun95 6	Apr-May,94-95
QA/QC-blanks	5
QA/QC-replicates	5

Nutrients
S2702	36	Mar93-Jun95 6	Apr-May,94-95
QA/QC-blanks	5
QA/QC-replicates	5

DOC/SOC
S2075	36	Mar93-Jun95 6	Apr-May,94-95
QA/QC-blanks	5
QA/QC-replicates	5

Pesticides
S2001	12	Mar93-Jun95 6	Apr-May,94-95
S2050	12
QA/QC-blanks	5
QA/QC-replicates	5
QA/QC-spikes	5

Suspended Sediment	36	Mar93-Jun95 6	Apr-May,94-95
QA/QC-blanks	5
QA/QC-replicates	5

Water temperature	cont	Mar-Sep,93-95

Specific conductance cont	Mar-Sep,93-95

Taxa
fish	3	Aug,93-95
macroinvertebrate	3	Aug,93-95
algae	3	Aug,93-95

Bed Sediment	3	Aug,93-95
**********

Table 8.--USNK High Intensity Phase sample summary--continued. 


No. of
13092747	samples	No. of
Rock Creek at	fixed	Period of samples Period of
Twin Falls, ID	interval Record	high-flow Record

Major Ions
S2701	36	Mar93-Jun95 6	Apr-May,94-95
QA/QC-blanks	5
QA/QC-replicates	5

Nutrients
S2702	36	Mar93-Jun95 6	Apr-May,94-95
QA/QC-blanks	5
QA/QC-replicates	5

DOC/SOC
S2075	36	Mar93-Jun95 6	Apr-May,94-95
QA/QC-blanks	5
QA/QC-replicates	5

Pesticides
S2001	20	Mar93-Jun95 6	Apr-May,94-95
S2050	20
QA/QC-blanks	5
QA/QC-replicates	5
QA/QC-spikes

SusSed	36	Mar93-Jun95 6	Apr-May,94-95
QA/QC-blanks	5
QA/QC-replicates	5

Water temperature	cont	Mar-Sep,93-95

Specific conductance cont	Mar-Sep,93-95

Taxa
fish	3	Aug,93-95
macroinvertebrate	3	Aug,93-95
algae	3	Aug,93-95

Bed Sediment	3	Aug,93-95


5. Schedule of LIP sample collection.

Table 9.--USNK sampling plan, FY1997, 13154500 Snake River 
at King Hill Id, Integrator

Maj Ion Nutri Pest
Month Week S2701 S2702 S2001 SusSed QA/QC Oct	2	0	0	0	0	0
Nov	2	0	0	0	0	0
Dec	2	0	0	0	0	0
Jan	2	0	0	0	0	0
Feb	2	0	0	0	0	0
Mar	2	0	0	0	0	0
Apr	2	0	0	0	0	0
May	2,4* 1	1	1	1	inorg repl,blk
Jun	2,4* 1	1	1	1	0
Jul	2	1	1	1	1	org repl,blk,spk
Aug	2	1	1	1	1	0
Sep	2	1	1	1	1	0
* - NO pesticide sample

Table 9.--USNK sampling plan, FY1997, 13092747 Rock Creek 
at Twin Falls, ID, Ag Indicator--continued. 


Maj Ion Nutri Pest
Month Week S2701 S2702 S2001 SusSed QA/QC Oct	2	0	0	0	0	0
Nov	2	0	0	0	0	0
Dec	2	0	0	0	0	0
Jan	2	0	0	0	0	0
Feb	2	0	0	0	0	0
Mar	2	0	0	0	0	0
Apr	2	0	0	0	0	0
May	2,4# 1	1	1	1	inorg repl,blk
Jun	2,4# 1	1	1	1	org rep,blk,spk
Jul	2,4# 1	1	1	1	0
Aug	2,4# 1	1	1	1	0
Sep	2,4# 1	1	1	1	0
# - pesticide sample ONLY


V. QUALITY ASSURANCE/QUALITY CONTROL

The objective of the QA/QC plan for the LIP is to evaluate sampling bias and variability in relation to changes or trends in environmental data. QC samples for surface-water chemistry should be collected and managed in accordance with NAWQA protocols (Miller, 1996). 

For FY97, the minimum number of surface-water QC samples collected in each LIP study unit should include:

(1) at least one field blank for each analytical schedule (and for 
VOCs, if sampled, at least one cannister blank); (2) at least one replicate sample for each schedule; and (3) at least one set of duplicate spiked samples for each pesticide 
and VOC schedule.

Subsequent QC sampling should be scheduled according to guidance in Miller (1996). Scheduling of QC sample collection might need to be modified in the future, subject to a national review of the suitability of the temporal distribution of QC data. 


VI. ESTIMATED FY97 and FY98 GROSS COSTS, LIP SURFACE-WATER QUALITY For consistency and to facilitate review and integration of Study Unit budgets at Regional and National levels, please provide study unit budget tables that are consistent with AIS management categories of each District and mapped to the default district management categories. Study units are requested to develop budget salary, NWQL, and burden estimates in AIS. Tracking of NWQL sample flow will be accomplished periodically from each District and study unit AIS master budget. 

Budget assumptions, overhead rates, and other explanations should be discussed and footnoted. For AIS-derived budgets, a copy of an AIS "Project Budget Summary by Account By Management Category" and "Management Category: OC. LABORATORY-CENTRAL LAB, Detailed" should be provided (via ftp and/or hard copy). For spreadsheet-derived budgets, please provide the name of the spreadsheet software and a TAB-DELIMITED output filename. Finally, please provide the ftp address from which the file(s) may be obtained by anonymous ftp. FY97 and FY98 table should be provided. Table 10 list the budget descriptions.


Table 10.--Estimated FY97 and FY98 costs, LIP surface-water quality. 


SWQ ECO SWQ ECO
CAT CATEGORY NAME DESCRIPTION OR DEFINITION	97 97 98 98
AC	Overtime	Overtime
AS1 Salaries 1	SU core personnel only & awards
AS2 Salaries 2	Non-SU personnel (or see P.)
C	Travel	Travel excluding NTC training
DD,FP Postage&freight USPS,FedEx,UPS,truck DG,DI Vehicles	Vehicles, GSA & Interior
G	Printing	Report printing & reproduction
HD	Contracts	Contract services, burdened
HZ	Contracts	Contract services, non-burdened
K	Training	District, NTC, & other training
L	Supplies	Supplies, non-Ocala
M,MZ Equipment	Equipment,computers,&software
N	Miscellaneous Miscellaneous expenses
OCL NWQL	NWQL analytical & taxonomic
OOL Non-NWQL	Contract lab, if any
P	Reimbursements Intra/inter-WRD SV (Q O&M,field
office,Ocala,&sediment lab)
T	Subtotal	NET TOTAL
U	District burden ((T-OCL)/(1-(U+V rates))*U rate)+
(OCL/(1-(.1+V rate))*.1)
V	Hdqtr burden ((T-OCL/(1-U+V rates))*V rate)+
(OCL/(1-(.1+V rate))*V rate)
TOTAL	GROSS TOTAL


VII. REFERENCES CITED
Luoma, S.N., Hsieh, P.A., Betancourt, J.L., Cayan, D., Hill, M.C., 
Robertson, D.M., Vecchia, A.V., Wagner, B.J., and Helsel, D.R., 1994, Guidelines for the Determination of Water Quality Trends in the National Water Quality Assessment Program: U.S. Geological Survey Report of the Committee, October 9, 1994, 35 p. Miller, T.L., 1995, Guidance on preparation of fiscal year (FY) 1996 
work plans for study units started in FY 1991: U.S. Geological Survey electronic memorandum from the Acting Chief, National Water-Quality Assessment Program, October 16, 1995, 12 p. Miller, T.L., 1996, Quality-control plan for National Water-Quality 
Assessment (NAWQA) program surface-water sites: U.S. Geological Survey memorandum from the Acting Chief, National Water-Quality Assessment Program, May 15, 1996, 2 p.; attachment, 14 p. (ftp://srv1rvares.er.usgs.gov/pub/nawqa, as 'qcplan.0596.fm) National Leadership Team, 1995, Low-intensity phase sampling guidance: 
U.S. Geological Survey electronic memorandum from National Leadership Team, National Water Quality Assessment Program, October 24, 1995, 4 p.
Sylvester, M.A., 1995, Draft operational plan for trends component of 
NAWQA: U.S. Geological Survey electronic memorandum from Assistant Regional Hydrologist for NAWQA, June 1, 1995, 11 p. Vecchia,A.V.,Jr., Wiche,G.J., and Berkas,W.R., 1997, Evaluation of 
sampling procedures for monitoring trends in surface water quality for the NAWQA program: Report to the NAWQA National Leadership Team, U.S. Geological Survey, January 6, 1997, 73 p. 

************************************************************************ 










