PROJECT ALERT NOTICE (NV) New RDG ordered and continued gage repairs

Date: Wed, 22 Mar 2023 11:16:20 EDT

Summary: Beginning to catch up, additional RDG ordered and crews still performing gage repairs.

Northern NV: Crews moving back into normal operations. Walker River nr Mason RDG (10295000) installed yesterday and crew will check this morning. Additional RDG ordered for Eureka County; installation expected next week. Will be adding discharge to existing Eureka RDG (10245980) next week. All gages are operational.

Southern NV: Crews staying in today to process data from the last week's high flows. Meadow Valley Wash at Caliente is still not accessible due to flooding impacts. Virgin Rv Blm conf with Muddy Rv nr Overton unable to access due to locked gates. Virgin Rv at Littlefield orifice is buried, crew installed a transducer yesterday to capture water levels. Other sites on the Virgin and Muddy Rivers that had high flow events last week have either been flagged for indirects or measured.

High water mark campaign still scheduled for next week in Eureka.

Accessibility FOIA Privacy Policies and Notices

Take Pride in America logo USA.gov logo U.S. Department of the Interior | U.S. Geological Survey
URL: https://water.usgs.gov/alerts/item_2023-03-22_11:16:20.html
Page Contact Information: Water Webserver Team
Page Last Modified: Friday, 01-Sep-2023 12:42:07 EDT