Station Flow AR Inflows Flow CC sites Flow
  cfs   cfs   cfs
1197A 2.76 1178.00 7.80 210A 17.40
1197B 4.90 1187.00 3.80 210B 17.40
1197C 5.06 1260.00 4.10 405.00 17.40
1197D 7.98 1312.00 6.00 805.00 17.40
1197E 8.00 1568.00 40.10
1197 total 28.70 AR total 61.80 1166.00 17.40
1211A 3.48
1211B 5.29
1211C 4.42
1211D 7.69
1211E 7.82
1211 total 28.70
1224A 2.90
1224B 3.97
1224C 5.40
1224D 5.76
1224E 10.68
1224 total 28.71
1234A 3.69
1234B 4.62
1234C 5.30
1234D 7.56
1234E 7.58
1234 total 28.75
1278A 4.47
1278B 6.35
1278C 10.22
1278D 5.07
1278E 6.69
1278 total 32.80
1299A 1.96
1299B 14.19
1299C 5.53
1299D 5.54
1299E 5.57
1299 total 32.79
1332A 2.02
1332B 5.51
1332C 8.56
1332D 12.88
1332E 9.81
1332 total 38.78
Note: values for 1998-2478 were obtained  when the samples were taken, approx. 9% lower than when other discharges were measured.
1560
1998 71.00
2238 71.00